SQS support, posted by Orkidia Bilani on 02 Nov 2022, 14:40
|
Discussed by the end of September with T.Mullins and D. Rivas, to remove the laser tables from the exp.hall area, in case they won't be needed anymore.
Today we supported SQS in dismountig and removing these tables (1*2 m²) from the exp.hall.
Coworkers: O.Bilani, S. Menzel, D. Rivas, J. Monotano |
SQS support, posted by Frank Siyli on 24 Jan 2024, 13:37  
|
Nils Rennhack unterstützt.
Leitungssätze im Podest entfernt und neu verlegt.
Coworker: Nils Rennhack, Sascha Menzel, Orkidia Bilani, Frank Siyli |
SQS start installation frame for exhaust, posted by Michael Luedeke on 16 Dec 2022, 11:51 
|
|
SQS Transport, posted by Benjamin Wolf on 18 Feb 2025, 10:34
|
Die Kammer #48500 aus XHE 1 in die Halle transportiert
|
SQS Support: 19-20.01.2023, posted by Orkidia Bilani on 11 Jan 2023, 17:58
|
SQS requested the following support from XHCrew:
Thursday and Friday of next week SQS expect to carry on some installation works in their hutch with expected activities: |
SQS Support in XHEXP1, posted by Orkidia Bilani on 22 Sep 2023, 10:47
|
SQS doesn't have many space left in their assembly area. Talked/dealed with the SQS colleagues, and managed to free spaces :-).
The parts/components will be transported to XHE1 and to Ütersen.
Sascha will do the transport to XHE1 on his shift over the weekend. The transport to Ütersen will be done next week. |
SQS Support in XHE1, posted by Orkidia Bilani on 27 Feb 2024, 15:43
|
Suppoerted SQS in XHE1 with disassembling parts from the cluster source and transported these components back to XHEXP1.
Co-workers: Y. Ovcharenko, A. Igharas, O. Bilani |
SQS Support am 22.08.2023, posted by Sascha Menzel on 23 Aug 2023, 13:29 14x
|
Bei SASE3 die Seitenwände vom Laserraum zwischen SASE3 und SASE1 demontiert (geöffnet) dann zwei Schubladenschränke mit dem Hubwagen weg
transportiert. Diverse Leitungen und Kühlwasserschläuche demontiert und die drei Lasertische mittels mobielen Kran aus dem Laserraum gekrant
und auf Transportrollen gestellt. Die Lasertische zur SQS Area transportiert und mittels Hallenkran in Holzkisten gekrant. Die Holzkisten hatte zuvor O.Smith |
SQS Support , posted by Orkidia Bilani on 01 Nov 2023, 11:07 
|
Discussed with T.Mazza on Monday, 30.10.2023, about storing temporarily in XHE1 the wooden boxes of an equipment they recevied recently.
They should be stored until the equipment is tested and working, so that if something goes wrong, it can be shipped to the manufacturer with
the original Verpackung |
SQS Support , posted by Orkidia Bilani on 28 Nov 2023, 19:33
|
Supported SQS with carrying the top small cabinets and placing them on the bigger ones.
Co-workers: O. Bilani, M. Peter, A. Igharas, J. Montano |
SQS Support , posted by Orkidia Bilani on 29 Nov 2023, 19:46
|
Brought Back from XHE1 into the Experiment Hall the "PAM - Chambers".
Co-workers: O. Bilani, H. Heuer
|
SQS Support , posted by Orkidia Bilani on 07 Aug 2024, 21:00
|
Dismounted a R+K "Gestell" of SQS. Brought the R+K to the Warehouse.
The wheels are still in the Exp.Hall, because maybe Sascha and Paul would need them soon. |
SQS Support, posted by Orkidia Bilani on 22 Sep 2022, 19:44    
|
SQS support:
-> Completed the building up of the vacuum pump and mounted it in the beamline (pic.a and b).
-> Craned and mounted (attached) the 1D XUV spectrometer (from Uppsala) into the beamline (pic.c and d). |
SQS Support, posted by Sascha Menzel on 26 Sep 2022, 15:23
|
Granitsteine (wo der 1D XUV spectrometer drauf steht) mittels Hutch-Kran versetzt.
Coworkers: Th.Baumann, O.Bilani, M.Lüdeke, S.Menzel |
SQS Support, posted by Sascha Menzel on 04 Oct 2022, 12:30 
|
XHCrew hat an das Reinraumzelt in der SQS Hutch eine Lochwand montiert.
Coworkers: M.Lüdeke, S.Menzel |
SQS Support, posted by Sascha Menzel on 07 Feb 2023, 13:10 
|
Für N.Rennhack (SQS) zwei Ausschnitte in einen Schaltschrank mit einer Stichsäge ausgeschnitten.
Coworkers: S.Menzel, M.Lüdeke |
SQS Support, posted by Sascha Menzel on 24 Mar 2023, 15:49 
|
Im SQS Labor E0.508 am Aufbau für die Hochdruckpumpen die Kühlwasserleitungen durch Schläuche ersetzt.
Coworkers: M.Togawa, S.Menzel |
SQS Support, posted by Sascha Menzel on 25 Mar 2023, 20:23   
|
Einen Halter zum befestigen von Schnellkupplung für Kühlwasserschläuche konstruiert und zusammen gebaut. Den Halter mit den Schnellkupplungen
an das Gestell montiert. |
SQS Support, posted by Orkidia Bilani on 05 Apr 2023, 18:14
|
Went with Yevheniy and Sergei to XHE1. They dismount and took some controllers and cables from the COMO setup. |
SQS Support, posted by Sascha Menzel on 18 Apr 2023, 19:02
|
Für SQS eine Kammer mittels Hallenkran auf ein Gestell gekrant.
|