ID |
Date |
Author |
Location |
Severity |
Subject |
560
|
17 Feb 2024, 06:05 |
Orkidia Bilani | XHEXP | Information | 16.02.2024 HiBEF: Transport to the experiment hall | Transported from XHE1 to XHEXP1 a box with parts for T. Toncian of HiBEF.
Co-workers: O. Bilani, S. Menzel |
561
|
17 Feb 2024, 10:30 |
Orkidia Bilani | XHEXP | Information | Waste | Disposed all the Plastik/Karton waste out from the experiment hall (waste belonged to: SCS, HiBEF and MID) |
562
|
19 Feb 2024, 14:37 |
Frank Siyli | XHEXP | Information | MID support | Support for Gabriele Ansaldi.
Switched mounting direction of the adapter plate and mounted the component on the MDS_2.
Coworkers: Gabriele Ansaldi, Frank Siyli
|
565
|
21 Feb 2024, 10:00 |
Orkidia Bilani | XHEXP | Information | Transport to XHE1 | Transport to XHE1 a component, linear stage for the XFELO project, from ME (M. di Felice); QR 61162
He will need it in the summer maintenance period.
Co-workers: O. Bilani, F. Siyli |
566
|
21 Feb 2024, 13:14 |
Orkidia Bilani | XHEXP | Information | HiBEF: LN2 Dewar | Filled a LN2 dewar for HiBEF (C. Baehtz).
|
570
|
27 Feb 2024, 10:03 |
Orkidia Bilani | XHEXP | Information | Transport to XHEXP1: SCS | Transport from XHE1 to XHEXP items (QR: 44451, 44452, 44453 and 46867) for SCS.
Co-workers: M. Pooch, O. Bilani |
572
|
27 Feb 2024, 15:27 |
Frank Siyli | XHEXP | Information | SCS support | Supported Carsten Broers to unscrew parts of the experimental structure. |
573
|
27 Feb 2024, 15:43 |
Orkidia Bilani | XHEXP | Information | SQS Support in XHE1 | Suppoerted SQS in XHE1 with disassembling parts from the cluster source and transported these components back to XHEXP1.
Co-workers: Y. Ovcharenko, A. Igharas, O. Bilani |
574
|
29 Feb 2024, 16:45 |
Frank Siyli | XHEXP | Information | SCS support | Air pad powered instrument move from SCS to the assembly area.
Coworkers: J.T. Delitz, C Broers, F.Siyli |
576
|
01 Mar 2024, 14:05 |
Orkidia Bilani | XHEXP | Information | General | -> Stromkabel @SQS:
The yellow and the orange ones was/is on the way in the experiment hall, posing thus a Stolpergefahr. Discussed with N. Rennhack and T. Baumann, the yellow one has been removed.
With the advice of O. Engelmann, the orange one will be shared and plugged in into the distributor with SCS (Oleg already informed SCS about). More details, next week.
-> Removed from the hall the waste originating from one of the empty tunnels.
|
579
|
05 Mar 2024, 07:13 |
Sascha Menzel | XHEXP | Information | 04.03 SCS Support | 04.03.2024
Eine Kammer vom SCS Bereich in derem Hutch mittels Luftdruck transportiert und auf die richtige Position gebracht/befestigt.
Vom blauen Untergestell die Verlängerung gelöst und mit dem Hutch-Kran auf eine Palette gekrant. Das blaue Untergestell mit dem Hutch-Kran auf Position gekrant und befestingt.
Coworker: C.Broers, J.T.Delitz, F.Siyli, S.Menzel |
580
|
05 Mar 2024, 11:28 |
Sascha Menzel | XHEXP | Information | SCS Support | In der SCS Hutch ein DSCC Detektor von einem R+K Gestell mit dem Hutch-Kran auf einen Tisch gekrant und befestigt
Coworkers: L.Le Guyader, F.Siyli, S.Menzel |
581
|
05 Mar 2024, 11:45 |
Sascha Menzel | XHEXP | Information | A+S Support | Firma A+S Brandschutztechnik das Gerüst aus dem Kran Gitter herausgegeben und beim Aufbau unterstützt.
|
582
|
05 Mar 2024, 14:42 |
Orkidia Bilani | XHEXP | Information | Damaged concrete floor in SASE3 and SASE2 | The damages of the concrete floor in SCS area and SASE3 in general, as well as the damages in SASE2 under the truck bay were discussed with K. Löptien.
The repair from the care takers will start very soon.
|
583
|
06 Mar 2024, 07:14 |
Sascha Menzel | XHEXP | Information | 05.03 SCS Support | 05.03
Ein Bauteil auf ein fahrbares Gestell mit einer von SCS angeschaften Traverse gekrant und zur SCS Hutch transportiert, dort mit dem Hutch-Kran und der Traverse aud das blaue Gestell gekrant.
Coworkers: J.T.Delitz, F.Siyli, S.Menzel |
584
|
06 Mar 2024, 10:32 |
Sascha Menzel | XHEXP | Information | SCS Support | 4x 13mm Löcher in eine Aluplatte gebohrt und diese mit M12 Schrauben und Nutensteine am blauen Gestell verschraubt.
Coworkers: F.Siyli, S.Menzel |
585
|
06 Mar 2024, 10:37 |
Sascha Menzel | XHEXP | Information | Schraubenschränke | 3 Schraubenschränke von der Warenannahme zur XHEXP1 transportiert und im Schraubenlager XOHutch aufgestellt.
Coworkers: F.Siyli, S.Menzel |
587
|
06 Mar 2024, 14:59 |
Sascha Menzel | XHEXP | Information | SPB/SFX Support | In der SPB/SFX Hutch diverse Bauteile auf der Schiene verschoben und auf die Kabelführung geachtet.
Coworkers: T.Dietze, N.Reimers, F.Siyli, S.Menzel |
588
|
07 Mar 2024, 12:48 |
Sascha Menzel | XHEXP | Information | SCS Support | Den Mamorboden in der SCS Hutch freigelegt / Bodenplatten entfernt und den Detektor auf Airpads in den Arbeits/Messbereich verschoben und befestigt.
Coworkers: J.T.Delitz, F.Siyli, S.Menzel |
590
|
08 Mar 2024, 15:37 |
Orkidia Bilani | XHEXP | Information | SXP Support | SXP wanted to buy and place a cabinet under the stairs in front of their experiment hutch and asked for advice. Unfortunately it wouldn't have worked, because of the narrow and low space/hight under the stairs (Stossgefahr).
In the exp. hutch they do have a (office) cabinet to store their experiment specific parts, which is not so quite allowed.
I offered them two steel cabinets (which are in the xhcrew consumable storage) which fits their requirements and to the space in their hutch.
Was happily accepted. Next week the removal of the white cabinet from their exp.hutch and replacement with the two steel cabinets will take place.
Also Vahagn and Manuel gave a lot of consumables (screws, nuts, waschers u.Ä) for the xhcrew storage.
|
|