SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 62
Entry time: 01 Jul 2019, 10:07
|
Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Status report after dispatch meeting 09.30 |
|
|
XO
FXE
SPB/SFX
- Detector tests are running this week. Before working on loops or around the detectors the SPB/SFX team should be asked/informed.
- The SPB/SFX team is on retreat on Thursday and Friday.
SCS
- Pulse IDs written by detector digitizers are recorded inconsistently by the different instruments. Some discussions have started to improve the situation and work is ongoing, but no target date is known. Right now the people working on this topic are BF, AS, KW, PG. A Karabo data guy should be also involved. The progress should be tracked in the Wednesday meetings.
SQS
MID
- Loop 7/11 need to be updated. Already coordinated with EEE.
- Loop8 is needed (remote control of the vac system).
HED
- Works in the tunnels will resume this week.
- Commissioning of the Amplitude laser is ongoing. The goal is to bring the optical laser beam into the hutch this week. There might be radiation involved, but HED is working together with SRP to define all the needed steps.
- This week radiation interlock tests are foreseen with D3.
Optical lasers
VAC
XRO
XPD
DET
EEE
CAS
- 2.5.0 will be deployed in SA3 tomorrow and probably in SA2 on Wed (depends on the outcome of the SASE3 deployment).
ITDM
SRP
TS