Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 306     Entry time: 07 Mar 2022, 10:39
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 07.03.2022  
General Announcement:
- Accelerator is now running at 11.5GeV for the next 4 delivery weeks. The SA1 and SA3 systems show already good photon intensities and at SA2 the Self-seeding setup is taking place today.

CTRL:
- ITDM would like to reboot control machines in SA1 and FXE. It will proceed around lunch time.

DA:
- Update of offline calibration: it went fine, successful.

EEE:
- Replacement uTCA of HED optics today.
- Past week cables installation went fine.
- Motors in SA3 SQS laser setup and motor to be updated.

VAC:
- ZZ on solid attenuator XTD2: adjusted solid attenuator in-position (driving 2mm less in) to get a fresh spot on Si foil.
- ZZ on XTD9 ion vacuum pump: shows noble gas instability; adjusted set point; hope to survive until shutdown.

XPD:
- Setting up HIREX for HXRSS.

DET:
- Nothing major to report.

ITDM: 
- Two servers to be updated (see CTRL report)

XRO:
- Nothing to report.

LAS:
- All fine with PP-laser.

UNSYS:
- Yesterday problem with cell 28/SA2: motor of undulator was stuck; after power cycle it worked.
- Issues with phase shifter in SA1: cell 26-31 is under investigation.
- Replacement of two phase shifter motors in SA3; possibly due to radiation damage.

SPB:
- Nothing to report.

FXE:
- Problem with LPD DAQ; ITDM solved last weekend.

MID:
- All fine.

HED:
- Exchange crate by EEE; busy preparing experiment.

SCS:
- Nothing to report.

SQS:
- Nothing to report.