Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 306
Entry time: 07 Mar 2022, 10:39
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 07.03.2022 |
|
|
General Announcement:
- Accelerator is now running at 11.5GeV for the next 4 delivery weeks. The SA1 and SA3 systems show already good photon intensities and at SA2 the Self-seeding setup is taking place today.
CTRL:
- ITDM would like to reboot control machines in SA1 and FXE. It will proceed around lunch time.
DA:
- Update of offline calibration: it went fine, successful.
EEE:
- Replacement uTCA of HED optics today.
- Past week cables installation went fine.
- Motors in SA3 SQS laser setup and motor to be updated.
VAC:
- ZZ on solid attenuator XTD2: adjusted solid attenuator in-position (driving 2mm less in) to get a fresh spot on Si foil.
- ZZ on XTD9 ion vacuum pump: shows noble gas instability; adjusted set point; hope to survive until shutdown.
XPD:
- Setting up HIREX for HXRSS.
DET:
- Nothing major to report.
ITDM:
- Two servers to be updated (see CTRL report)
XRO:
- Nothing to report.
LAS:
- All fine with PP-laser.
UNSYS:
- Yesterday problem with cell 28/SA2: motor of undulator was stuck; after power cycle it worked.
- Issues with phase shifter in SA1: cell 26-31 is under investigation.
- Replacement of two phase shifter motors in SA3; possibly due to radiation damage.
SPB:
- Nothing to report.
FXE:
- Problem with LPD DAQ; ITDM solved last weekend.
MID:
- All fine.
HED:
- Exchange crate by EEE; busy preparing experiment.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |