Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 302     Entry time: 21 Feb 2022, 11:57
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 21.02.2022 
General Announcement:
- Philipp S. says a downtime for the calibration / GPFS update is to be done today at 12:00.
- Raul V. says that the biggest issue of last PRC week was related to the FXE beam pointing. In general, was a quiet and productive week. Please, instrument shall remind to make entries in the operation e-
log.

CTRL:
- In SA3 GATT activity will be performed today (fix to slowness) as beam is down and there is no activity.

DA:
- Announcement will come today: restart GPFS issue / Maxwell to be restarted.

EEE:
- One OCD on Saturday: issue with SDL motors in MID; to be followed up today.

VAC:
- Nothing else apart of the Gatt fix.

XPD:
- Shimadzu camera is installed in XTD6. A test has to be done and organized with instruments. 

DET:
- Nothing to report.

ITDM: 
- Fix to be deployed today: plan is to deploy Maxwell cluster done in the background; it shall not disturb any user of the system. All other storages with login to be done in March and still to be 
confirmed.
- Slow data investigated: get wrong values with time stamp that could be corrected. Further investigation will take place this week.

XRO:
- FXE stability pointing issues on Friday afternoon: Raul V. placed a report in Operation E-log.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Pointing issue from Friday;
- In DAQ the BAM device name has changed and could not be used. Please keep the compatibility for names; A. Silenzi will check with CTRL.

MID:
- Motor problems: in touch with CTRL.
- Today morning the CRL2 lenses were retracted but not giving the proper signal. It has been under investigation.
- Issue with DAQ: slow devices were saving empty data (no entries); at least happening with two devices. It has been reported and one is fixed and the second is under investigation.

HED:
- Initial setup this afternoon for the two-color operation.

SCS:
- Not present.

SQS:
- Not present.