Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 298     Entry time: 07 Feb 2022, 10:56
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 07.02.2022 
General Announcement:
-  Power glitch on Sunday morning at around 04:00AM seems to have no effect at machine or Schenefeld site.

CTRL:
- During winter shutdown the bunch arrival monitor was updated. An e-mail will be sent reflecting the changes.
DA:
- Single OCD call was solved: configuration of train match bridge to eXtra foam.

EEE:
- Two tickets from MID shall be followed this week.
- Tickets from DOC on SQS (solved) and PES (to be fixed by DA).

VAC:
- All fine with VAC.

XPD:
- All fine with Diagnostics.

DET:
- Nothing to report.

ITDM: 
- Wednesday there will be shutdown of rack room in ground floor (604): details were sent by e-mail and there were no concerns/feedback from potentially affected people.

XRO:
- Nothing to report.

LAS:
- All 3 PP-lasers are stable and will be available by the end of the day.

UNSYS:
- Issue FRI/SAT: bad communication between balcony and SASE1 cells. It is solved but being further investigated.
- This morning there was a BKR request to go lower undulator gaps in SA2: gap can go as lower to 10.61mm.

SPB:
- Commissioning of AGIPD done; successful week.

FXE:
- Preparing the beamline; ready for beamtime.

MID:
- Issue with RF window: it was too short when they received the beam. Solved by PRC and instruments for fast solution.
- EEE had to solve an issue.
- Cameras in the tunnel monochromator may need a ZZ. This afternoon VAC will join for a ZZ and fix it.
- Week was successful.

HED:
- Quite successful beam usage last week.
- Issues with fast ADC devices not working until Wednesday. It worked for 24hs and then had to be restarted again and came out with wrong settings. 
This needs further investigation and is needed for users this week. CTRL will follow up.

SCS:
- Preparing with UAC from tomorrow.

SQS:
- Safety problem with magnet interlock in one door: a loose screw was fixed (for the time beam).
- Issue with digitizer: SQS will clarify with CTRL.
- Recheck calibration of monochromator (needs cameras looking to the motor): it seems that the camera has to be discussed with XRO. 
Martin D. says that currently Maurizio V. is in the tunnel and SQS shall contact for the possibility of a quick fix now.
- Zunaira A. says that if beam shutter closes without apparent reason: it can be related to emergency off, panic switch, air box or the maglock. It happens 3 times on the same day. If this happens again, 
it may trip the entire accelerator. 
People in safety group or laser interlock are responsible for fixing the maglocks. A. Galler asks Zunaira A. to send an e-mail to xo-info@xfel.eu. 
Alberto Defanis says that Eric B. has fixed. Zunaira comments that this fix was momentarily for the weekend. Further discussion will follow.