Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 273
Entry time: 01 Nov 2021, 10:10
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 01.11.2021 |
|
|
General Announcement:
- XO is currently setting scheduling meetings with the groups for planning and cross-checking the preparation for the Winter maintenance 2021. Meetings will take place between this and next week.
CTRL:
- Nothing to report.
DA:
- Announcement on the online calibration: for SPB it will be upgraded to Karabo 2.11. Today is preparation and later this week it will be deployed for the user beamtime.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Together with CTRL and DA and HED/MID instrument: solving hardware problem of online cluster - one has to swap locations of SA3 and SA1. This is ongoing right now.
XRO:
- Nothing to report.
LAS:
- Water leak in SA1. TS is aware and fixing it. The PP-laser was not switched OFF.
UNSYS:
- All is good; The seeding crystal in SA2 is on the right position for the self-seeding. Support will be available for helping the expert.
SPB:
- Nothing to report; Interesting data was acquired along the week and analysis will take few weeks.
FXE:
- Nothing to add.
MID:
- All fine.
HED:
- User experiment;
- Yesterday after midnight beam intensity dropped down from 1mJ down to 300uJ and BKR did not managed to recovered it.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |