Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 261     Entry time: 20 Sep 2021, 10:19
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 20.09.2021 
General Announcement:
- On last week's cryogenic failure at the machine: the root cause is tracked to a failed temperature sensor that bring down several pumps.

CTRL:
- Time slot for Beckhoff update of Mc2 motors is tomorrow between 09:30-11:00. This update is for all topics in tunnels and experiments. 
Change of parameters must not occur (for the ones which are stored in Beckhoff). Nevertheless, it is good for groups to check parameters that are not stored. 
An e-mail will be sent to communicate it and a second one when the update is finished.

DA:
- Nothing to report.

EEE:
- EEE supports the mentioned loop updates (care of PLC system).
- Cabling installation in FXE and HED have started and are ongoing during this week.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Gitlab update takes this week, on Thursday at 16:00. An e-mail will be sent to readiness.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Stable operation during the weekend with a problem solved by DOC. A beam jitter was also observed on the weekend related to a feedback.

MID:
- All fine at MID.

HED:
- Finished user experiment; nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.