Message ID: 253     Entry time: 23 Aug 2021, 10:03
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 23.08.2021 
General Announcement:
- There were two minor power glitches on Saturday morning but with negligible effects to machine.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Update of EPS-SA1 loop was done this morning in order to enable the FXE imagers modes.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- DSSC is installed back to SCS and put into operation last Friday.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- All AMPHOS are ON and LAS is preparing PP-lasers for instruments today.

UNSYS:
- Issue with cell5/SA1 phase shifter: M. Yakopov confirms a power cycle was made to recover it.

SPB:
- Problem with Karabo (misread 2 of vacuum gauge values): the problem was a terminal of the crate was broken. After the terminal has changed, it works fine. 

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.