General Announcement:
- D3 starts the radiation interlock / TUV tests at XHEXP1 today. Initially by SA1, followed by SA3 area.
Torsten Schoen will be available to bridge SA2 power supply only when tests are to be done in these instruments. One can work in SA2 until RPOs arrive to start tests in that hutches.
- Accelerator will start next week and first delivery beam to instruments is on cw29.
- First UOM starts on July 9th possibly discussing X-ray delivery parameters.
CTRL:
- Influx logger stress tests taking place this morning between 10:00 and 11:00.
- Karabo 11.2 is out and instrument contacts will get in touch for deployment.
- Fix for the time zone configuration together with EEE: hopefully by the end of the week this will be fixed automatically otherwise it is done manually.
DA:
- Nothing to report.
EEE:
- PLC modifications at SQS is done; then followed at SCS and FXE.
VAC:
- Nothing to report.
ME:
- Working together with VAC, XRO, XPD and UNSYS.
XPD:
- Andreas K.is working in XTD9, testing synchronization signal for Shimadzu camera (sync signal comes from PLC).
DET:
- LPD detector at FXE had water condensation yesterday. The chiller was ON with low temperature set (15 C). Together with EEE put detector in safe state (detector was OFF but not the chiller).
Responsible person will be back in two weeks. Martin K. adds says that temperature setpoint was then set to 22 C and there is no apparent reason for the 15C set.
ITDM:
- Nothing to report.
XRO:
- Info to SA3 instruments: XRO would like to test SA3 mirror motors from 10:30-11:30. Please do not touch mirrors in this timeframe. SQS and SCS do not see problems with it.
LAS:
- SA1 and SA3 PP-lasers are restarted and preparing for operation.
- Trigger for SA3 PP-L after Karabo upgrade does not work. The feedback also does not regulate. Tickets were sent to CTRL. After feedback it may contact also EEE.
- SA2 Seeder oscillator is exchanged and sync has to be restarted.
- A. Galler asks about spares for Seeders. Man J. says the spare was installed in SA2; one remaining oscillator is used in the lab and then LAS must stop R&D projects in case it is used as spare for one of
the PP-lasers.
UNSYS:
- Nothing to report.
SPB:
- Richard B. says tunnels trigger that XPD works in tunnel have no relation to the timing trigger board.
FXE:
- LPD issue: chiller appears to be dry again this morning after setting it to 22 C.
MID:
- Nothing to report.
HED:
- Fuses activity to start today. EEE and Bruno F. confirm this plan.
SCS:
- All fine at SCS.
SQS:
- Nothing to report. |