Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 235
Entry time: 21 Jun 2021, 10:56
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 21.06.2021 |
|
|
General Announcement:
- Interlock tests starting this week. An e-mail was sent to xo-info@xfel.eu and if clarifications are needed please get in touch with XO.
- Zunaira A. asks if XO knows if emergency OFF will be tested and power would be bridged.
XO has no info on specific tests for emergency buttons and understands power will be bridged as it was done in the past. XO will confirm with Wolfgang C. / D3.
- From Wednesday of this week tunnels will be closed. If a task is pending, please contact XO.
- Jan G. asks if uTCA maintenance in tunnels are finished. Bruno F. says that tunnels are completed.
- Sunday morning 7:30AM there was a warning on the power stations but no systems faced power outage as much as it was reported. Please check your devices and systems for
potential power failures yesterday.
CTRL:
- Control monitors update happening this week.
- Today CTRL needs exclusive SA3 access to motion loops for middle layer devices updates.
- Cameras with Clone work in the Lima version: intervention for these cameras between today and tomorrow.
- Influx logging system: CTRL asks XPD that there are messages being received frequently from the PES and needs to switch it OFF for a while.
CTRL will contact Joakim Laksman if tests are being made otherwise it is not a problem to stop PES for minutes.
DA:
- Nothing to report.
EEE:
- uTCA updates to continue on Wednesday.
- SPB crates modifications ongoing and discussion with other instruments is taking place.
- Missing feedback from MID and HED for cable installation.
VAC:
- Finishing tunnels tasks.
- Question to EEE on when the issue with SA1 vacuum loop could be addressed. Bernard B. says he will check the issue mentioned Friday afternoon by today.
XPD:
- SA1 alignment of Shimadzu camera ongoing; Other works from A. Koch are finished.
- Jan G. says that tasks are finished apart of a MCP motor in SA2 (ticket has being issued and Bernard B. will take care of it after this meeting). Issue is that motor
does not move in reality.
DET:
- Nothing to report.
ITDM:
- Reminder was sent on creating new proposals for the next half-year. Related in a change in how to clone the commissioning proposals. Please give a feedback to ITDM
today.
XRO:
- Working in tunnels.
LAS:
- SA1 AMPHOS activity is ongoing and takes longer than expected. To be finished tomorrow or Wednesday. It has to be discussed with XO as other activities are planned
which affect SA1 PP-laser.
- On Friday SA3 there was cooling water maintenance that switched off PP-laser. To be addressed by XO.
UNSYS:
- Nothing to report.
- Tunnels can be accessed until Tuesday 21.06. Zunaira A. adds that the Interlock tests started this week and go on during next week.
SPB:
- Supporting EEE with changing the crates. Good progress has been done.
- Problems with uTCA crates after the upgrades (fast-ADC can't be reset; previous settings are missed after the upgrade).
FXE:
- Nothing to report.
MID:
- All fine at MID.
- Contact to EEE will be made on the cabling feedback.
HED:
- All good at HED.
SCS:
- Nothing to report.
SQS:
- Last Friday tried to run digitizer again after upgrade: minor issue and if not solved today SQS will get in touch with EEE/CTRL. |