General Announcement:
-
CTRL:
- Announcement: tomorrow starts Karabo deployment on FXE in SA1 as well as ITDM; Wednesday the MC2 upgrade for the rest of facility (already done in SA2) will take place.
- Device clone fix to be deployed today (e-mail sent to readiness).
- Two versions of ReadtheDocs exit (Old one will be OFF on the July 5th). If someone has an old project at the old version of ReadTheDocs please change to the new
version.
DA:
- Nothing to report.
EEE:
- Reminder that uTCA systems are under maintenance this week (interruptions planned in balcony rooms).
- EEE received report last Monday from SPB with issues on motor cables from Beckhoff controllers. Electrical current could go very high but not enough to trigger the
fuses and consequently overheats and has a fire risk.
EEE is looking implementations to take place this week in crates. Ordered parts shall arrive beginning of this week.
It is a large intervention to introduce 1-2 fuses in the modules/terminals of all crates in tunnels and experimental Hall.
- Steve A. adds that the changes are piece cases, each crate will be touched; if 50% of the crates are changed during this maintenance, one reduces 50% the chances for
fire.
P. Gessler comments that one has to limit the current of the 24V terminals, by introduction the additional fuse. All crates will be touched but it is a linear change.
VAC:
- Investigating the situation with motor terminals. A. Galler says tunnels will start being closed next Monday and will find the exact date for XTD6 and XTD9 closure.
- Shutdown work ongoing but no issues to report.
XPD:
- A. Koch, N. Kujala and W. Freund say there is nothing to report.
DET:
- Nothing to report.
ITDM:
- Reminder on the e-mail of the gateway maintenance proposed to take place on Friday. In case of issues please contact ITDM.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
- Pouneh S. asks when AMPHOS engineer will come this week. Man Jiang (LAS) says that work starts today from 10AM with the amplifier in SA1.
Man J. will inform back Pouneh on a detailed schedule for this week.
UNSYS:
- After a delay in Afterburner project activities with MEA group, the infrastructure problems at the beginning of last week were solved by TS.
The work is currently ongoing for the afterburner project and mechanical elements have been installed.
- Today there will be adjustment of the base plates pedestals; from tomorrow work with concrete filling takes place. Planned tasks for the afterburners will be completed.
- Cell18/SA1 problem: it was not needed to replace the quad mover.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- All fine at HED.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |