Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 218     Entry time: 21 Apr 2021, 10:50
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 21.04.2021 
General Announcement:
-  XO reminds on the deadline of 30.04 for submitting the Summer maintenance task lists. For this, please do so sending the list to xo-planning@xfel.eu. 

CTRL:
- Update on undulator Doocs side: CTRL needs to test for two or multi-colors schemes and asks instruments to CTRL if there are plans to use it.
- CTRL will schedule a short practical training on Beckhoff devices for next Wednesday. An announcement will be made through readiness mailing list.

DA:
- Nothing to report.

EEE:
- From the PLC side, EEE is following up the MID/CRLs interlock case.
- If groups submit a change request needed to be implemented during summer maintenance time, please contact and inform EEE beforehand.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- The network cable exchange mentioned last Monday was done.

XRO:
- Not present.

LAS:
- All 3 PP-lasers are in operation.

UNSYS:
- After power glitch on Monday in SA1, about half the undulator cells were half power cycled. Most could be recovered expect SA1/cell33 and SA3/cell1. This will require 
ZZ accesses. 
XO states the power failure was man-made caused.
- Quad mover sudden move: Lars F. from MXL does not have records on the command given for the sudden move and therefore the root cause can't be traced.

SPB:
- Nothing to report.

FXE:
- Beam since yesterday; one interlock issues. 
Nerea J. says a ticket was received and the interlock issue was related to a Imager that always come up activated. This will be removed from the EPS.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Undulator photon energy couldn't be changed via Karabo. Jan-Torben D. will talk to Steffen H; David Hickin adds that the location was changed and the Karabo side is 
done/corrected. 
One needs the BKR connection/authorization and this will be organized by CTRL/Steffen H.

SQS:
- Issue with digitizer on work. It is needed for next week.