General Announcement:
- XO reminds on the deadline of 30.04 for submitting the Summer maintenance task lists. For this, please do so sending the list to xo-planning@xfel.eu.
CTRL:
- Update on undulator Doocs side: CTRL needs to test for two or multi-colors schemes and asks instruments to CTRL if there are plans to use it.
- CTRL will schedule a short practical training on Beckhoff devices for next Wednesday. An announcement will be made through readiness mailing list.
DA:
- Nothing to report.
EEE:
- From the PLC side, EEE is following up the MID/CRLs interlock case.
- If groups submit a change request needed to be implemented during summer maintenance time, please contact and inform EEE beforehand.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- The network cable exchange mentioned last Monday was done.
XRO:
- Not present.
LAS:
- All 3 PP-lasers are in operation.
UNSYS:
- After power glitch on Monday in SA1, about half the undulator cells were half power cycled. Most could be recovered expect SA1/cell33 and SA3/cell1. This will require
ZZ accesses.
XO states the power failure was man-made caused.
- Quad mover sudden move: Lars F. from MXL does not have records on the command given for the sudden move and therefore the root cause can't be traced.
SPB:
- Nothing to report.
FXE:
- Beam since yesterday; one interlock issues.
Nerea J. says a ticket was received and the interlock issue was related to a Imager that always come up activated. This will be removed from the EPS.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Undulator photon energy couldn't be changed via Karabo. Jan-Torben D. will talk to Steffen H; David Hickin adds that the location was changed and the Karabo side is
done/corrected.
One needs the BKR connection/authorization and this will be organized by CTRL/Steffen H.
SQS:
- Issue with digitizer on work. It is needed for next week. |