SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 212
Entry time: 31 Mar 2021, 11:01
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 31.03.2021 |
|
|
General Announcement:
- There is no UOM on next Friday April 02.
- The next XO Int. Meeting takes place on Wednesday 07.04.
CTRL:
- Loop updates by EEE today - CTRL will follow in case of support is needed.
DA:
- Offline calibration pipeline update was done yesterday successfully.
- Online calibration pipeline update: on Monday it was done in SA2; today it takes place in SPB with tests on the afternoon. These updates are related to the Detectors
for the upcoming next user experiments.
EEE:
- Update in SA3 and SA2 motion loops from 10:00 to 15:00.
VAC:
- Not present.
XPD:
- Information got on the test of PKG for SA2: tests foreseen for this week was postponed.
- XPD working on the calorimeter.
DET:
- Nothing to report.
ITDM:
- Update of the dCache storage was successfully done yesterday.
XRO:
- Nothing to report.
LAS:
- SA1 and SA2 PP-lasers are fine;
- SA3 PP-laser problem with timing system was fixed but required longer than expected. Laser was OFF until this morning. SQS shall not count with available laser (50-50%
chances) tomorrow morning.
UNSYS:
- PKG test was shifted.
SPB:
- Problem with laser hutch interlock when closing the door: when closing the external door this breaks the interlock (laser hutch). SPB will contact SRP.
FXE:
- Nothing to add.
MID:
- All right at MID.
HED:
- HED loop update takes place tomorrow. Nerea J. will discuss with HED; there is no restrictions from HED side.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |