Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 209     Entry time: 22 Mar 2021, 10:14
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 22.03.2021 
General Announcement:
- The Covid-19 health task force is looking into testing schemes to be employed on-site. In the future there will be an opportunity to do the self-tests on-site for 
people who does critical works.
- The UOM series will restart on next Friday 26/03 at 09:00. Communication via e-mail will be send.

CTRL:
- Follow-up for delay train-ID: progressing with discussion on using longer time data.

DA:
- Thomas Michelat reports one issue with Agipd. The Maxwell server was restarted and then issue was fixed. If something similar happens again, the advice is to contact 
Maxwell team from Desy.

EEE:
- Today EEE perform the SEPS update for SA3 Interlock. For SA2 the test takes place on Thursday.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- ITDM reminds on the storage/cache maintenance taking place next week (inclusion of additional storage place). Janusz S. will send an e-mail to readiness list.

XRO:
- Nothing to report.

LAS:
- SA3 PP-laser is off today due to work on interlock system. LAS hopes to get back as soon as possible (not before Thursday/Wednesday) for SCS use.

UNSYS:
- Problem in cell36/SA1 (communication error). A ZZ will be needed to recover the cell.

SPB:
- Ongoing with preparations for back-up user experiments; A problem with Jungfrau has been communicated.

FXE:
- Problem with Mono last week: positions for the crystals were shifted by 10mm. It is not known if this is a physical or only reading issue.

MID:
- Pressurized air by a compressor was moved to another location; the topic was discussed with TS and a big compressor will be installed until May 1st to solve problems. 

HED:
- Nothing to report.

SCS:
- Issued a ticket with EEE to verify possibility to averaging positions on middle layer servers.

SQS:
- Preparing for beam in April.
ELOG V3.1.4-7c3fd00