General Announcement:
- XTD10 tunnel was closed last Friday; XTD9 to be closed by end of this week; XTD6 is undefined – mostly likely by Monday. Any schedule deviation will be communicated.
CTRL:
- Deployment of offline services from 10.2 to 12.2. Services such as offline calibrations are not reliable in this time. An e-mail was sent and another reminder will be sent again.
DA:
- no news.
EEE:
- Update of PPL uTCA in SA1 today (laser);
- SASE2 PLC loop update to take place tomorrow at 13:00 (Hirex and Shimadzu camera).
VAC:
- Nothing to report
XPD:
- No issues to report.
- Andreas K. says in SA1 hardware activities are done; testing optical alignment.
- Hirex SA2 update is missing.
DET:
- nothing to report
ITDM:
- nothing to report
XRO:
- nothing to report
LAS:
- Switching on SA1 laser – after uTCA upgrade. Small issue relates to the missing trigger from Desy (dynamic triggers). Point of contact are Tim Wilksen and Lars Froelich.
UNSYS:
- Hick-ups with controls during the weekend. BKR opened gaps to 220mm and caused troubles (usually they open o 210mm).
- One ambient field coil needs ZZ for fixing (SA2/cell12); not urgent.
- Cleaning was done in XTD4.
SPB:
- setting up for the first set of commissioning
- Gotthard trigger seems to be solved.
FXE:
- nothing to add
MID:
- all fine
HED:
- nothing to add
SCS:
- not present.
SQS:
- uTCA digitizer issue: ongoing. |