Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 28 of 29  Not logged in ELOG logo
Entry   Karabo Names in Vacuum component list, posted by Tobias Haas on 24 Jan 2017, 08:23 

 Post on behalf of Alessandro Silenzi:

 

please find below the link to the first version of the master component list and the link to the direct download:
 
 
 
Please give your comments directly to me to avoid confusion.
 
The next steps after collecting your input, will be to implement a test in the Firmware project generation that will test the deviceIds against this list.
 
Best regards
 
Alessandro Silenzi
 
Entry   Karabo Names in Vacuum component list, posted by Tobias Haas on 24 Jan 2017, 08:21 

Post on behalf of Harald Sinn:

 for the non-vacuum part of WP73 we have the following situation: 

Last Friday Alessandro and myself had a meeting and agreed to use the names given in the document
 
 
(CAS inbox for software requirement documents)
 
The only change will be in the naming of the power supplies for the hard X-ray mono 
(which will be changes to analog input /output)
 
You can use the names is this document therefore already. However, Alessandro will 
create Excel tables out of it, which will be then used in the future for reference. 
Also the extension to SASE3/2 will be done in this Excel document. 
 
Best regards 
 
Harald
 
Entry   STATUS UPDATE: XTD2 Differential Pumping Modules running under interlock control, posted by Tobias Haas on 24 Jan 2017, 08:17 

 Post on behalf of Raul Villanueva:

As we just finished the exhaustive testing and final adjustments of local
test and the interlock program for each of the turbopumps at each
Differential Pumping Sections in XTD2 Tunnel, we are happy to announce
that the system has been released and is up and running smoothly and under
control.  That means that the isolation gate valves in front of each
turbopump is open and therefore the latter is pumping already the beamline
as expected during the upcoming operation phase of the facility. That also
means that WP74, after having already received the wiring documentation
from the Vacuum Group can proceed with the same protocol to keep the whole
gas section in XTD2 in a consistent fail-safe status.

With this positive news, we wish you to have a nice evening,

Regards,

Raúl, Tobias and Nerea,

 

Entry   VCTF-list updated, posted by Sabine Cunis on 09 Jan 2017, 10:47 

The VCTF-components-list  has been updated. Labels on components, as far as visible, are in accordance with names in list.

... please, check for consistency, when naming and labeling XGM components!

Entry   Meeting Minutes 23 Dec 2016, posted by Frederike Wittmaack on 03 Jan 2017, 08:46 
Please follow the link to view the minutes: http://tinyurl.com/h3qspzz
Entry   XGM Safe State Definition, posted by Frederike Wittmaack on 19 Dec 2016, 09:44 
as defined by Jan Grünert: available on Alfresco: XGM-safe-state.docx and available at N:\4all\intern\User data\wp74\Devices\11-1_XGMD\03 - Components\XGM-safe-state.docx
Entry   Meeting Minutes 16 Dec 2016, posted by Frederike Wittmaack on 19 Dec 2016, 09:32 
http://tinyurl.com/zzzy7sd
Entry   Meeting Minutes 09 Dec 2016, posted by Frederike Wittmaack on 09 Dec 2016, 15:31 
http://tinyurl.com/gqykf7z
Entry   Meeting Minutes 02 Dec 2016, posted by Frederike Wittmaack on 07 Dec 2016, 17:09 
http://tinyurl.com/hzq7ats
Entry   Remote access to control network form , posted by Frederike Wittmaack on 02 Dec 2016, 11:47 
http://tinyurl.com/jskzj2h
Entry   Meeting Minutes 25 Nov 2016, posted by Frederike Wittmaack on 02 Dec 2016, 11:46 
http://tinyurl.com/jydty26
Entry   new components list , posted by Sabine Cunis on 02 Dec 2016, 11:43 

please find the new (extended) components list under the old link given in the minutes http://tinyurl.com/zn7otsa ,

and check whether all components are included and charakterized by the correct data.

 

Entry   Meeting Minutes 17 Nov 2016, posted by Frederike Wittmaack on 24 Nov 2016, 11:38 
http://tinyurl.com/hxaxdm9
Entry   Meeting Minutes 11 Nov 2016, posted by Frederike Wittmaack on 14 Nov 2016, 14:10 
http://tinyurl.com/juhjcbf
Entry   Mandate for the Extension of the Vacuum Controls Commissioning Task Force, posted by Tobias Haas on 11 Nov 2016, 15:43 

The Vacuum Controls Commissioning Task Force initially helped to get the vacuum components extending from the gate valve at 2678 m to the gate valve at 2730 m in XTD2. This comprised the valves and pumps and the associated vacuum interlock logic. The necessary components were all installed and locally tested. As the next step the PLC firmware for the control of these devices was generated including the interlock logic. Finally the system was connected to version 1.47 of Karabo, which was able to monitor and control all components. A live demonstration is currently still outstanding.

 

As the next step the vacuum section considered should be extended upstream to include all components up to the gate valve at 2630m. In addition to vacuum components this should include the installed photon beam line components. The goal is to include all these systems into one continuous vacuum, commission all systems locally, generate the PLC firmware, implement the required vacuum interlocks, monitor the state of the system remotely via the PLC command line interface and eventually connect to Karabo and monitor and control the system via Karabo remotely using the consolidated version 2.0. While this commissioning effort is going on, development should occur on three days during the week (Mo-Wed) while the system should be operated continuously during the remaining time, thus also testing long-term stability. This should be achieved by the end of 2016.

Entry   Update of Component list, posted by Tobias Haas on 09 Nov 2016, 15:36 elog.tiff

I have included the status columns provided by Alessandro and Sandor in the component list. Please find it in the usual location here: http://tinyurl.com/zn7otsa

Entry   Karabo Installation back to normal, posted by Alessandro Silenzi on 07 Nov 2016, 19:15 OK.pnginterlocked.pngbackToNormal.pngafteron.png

 Karabo to PLC communication has been tested successfully in the SA1 Vacuum installation.

in attachment:

OK.png -> Initial Status, all OK

interlocked.png -> pump P10300I is turned off -> Setpoint -> off -> Valve automatically close and set "Interlock OK" to false

afteron.png ->  pump P10300I is turned on again but-> Setpoint -> off -> Valve automatically close and set "Interlock OK" to false

backToNormal.png -> Like initial status but valves stay closed

 
Entry   BeckhoffDevices back to responsive, posted by Alessandro Silenzi on 04 Nov 2016, 18:08 

 I reproduced the behaviour of the PLC on beckhoffSim. This reproduces the same behaviour seen in the tunnel devices (devices hang).

Implemented the fix and verified the correct behaviour with beckhoffSim.

Fixes will be verified next Monday with the tunnel system.

Have a nice weekend

Alessandro

 

ps: For future reference:

beckhoffSim  tags/1.1.0-1.4  (implements the recent plc behaviour (framework tag N/A Could not find tobias))

beckhoffDevices tags/2.0.1-1.4 hangs

beckhoffDevices tags/2.0.2-1.4 does not

 
Entry   Minutes - Meeting November 4, 2016, posted by Frederike Wittmaack on 04 Nov 2016, 14:22 
http://tinyurl.com/jbog6tz
Entry   Minutes of last weeks meeting (Oct 28, 2016), posted by Frederike Wittmaack on 04 Nov 2016, 08:03 
http://tinyurl.com/jy5rsbx