SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 427
Entry time: 01 Dec 2017, 11:42
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status and plans after SASE1 Status/SASE3 Readiness Meeting |
|
|
General:
- User Operation ongoing until Tuesday 5 Dec 8 AM
- CAS shall present a release plan for KARABO 2.2 next week
- Dispatch meetings shall move to a Mo/Wed 13:00 schedule starting next Wedneday 6 Dec
Instruments
- FXE:
- Scantool was successfully used to establish overlap with laser beam (Tangerine)
- Some problems with slow DAQ in particular also for tunnel components
- Comment from ITDM: There are known issues with the slow data acquisiton. A new version exists that was intentionally not deployed before the end of UOP
- SPB
- Just finished first shift of laser user experiment
- No big problems
- All goals in the optimistic schedule were achieved
Tunnels
- Currently preparing for the shutdown
- Sticking condition of mirror bender could be reproduced in the lab
- WP74 just installed the last missing pieces in XTD1
Laser
- Running
- temporal and spatial overlap with beam is achieved
- But now instruments do not intend to use the PP laser for the last experiment
Detectors
- Both detectors are working
- The DAQ for slow data is crashing occasionally
- Gotthard is fully operational but there problems getting the data out. Help from PSI is needed
AE
ITDM
CAS
- CAS-XPD Running:
- We will finish next Monday
- We have been addressing issues related to MCP, Karabo-DAQ, Cameras, and K-Mono
- Deploy K-mono today
- Review DAQ Groups in Karabo: Cyril (interface to ITDM), Liubov, Koch
- Gotthard we have to address in a separate and more systematic discussion: trigger, operation, calibration...
- XGM memleak - we already have a fix to get it stable but have to check when we will be able to upgrade (only device).
- Internal discussion about CAS/Karabo priorities for the winter shutdown
|