Message ID: 424     Entry time: 22 Nov 2017, 10:57
Author: Tobias Haas 
Location: General 
Severity: Information 
Subject: Status and Plans after 0930 meeting 

General

  • User experiments resume tomorrow morning
  • Beam should be coming back late this morning or early this afternoon
  • After the Operation Coordinaton Meeting H. Sinn, L. Samoylova and the instruments will align the mirrors
  • Beam to the instruments should be available directly after this

Instruments

  • SPB:
    • The last night with beam on Monday was used to take flat field calibrations with AGIPD
    • The timing for overlap with the optical laser was adjusted
    • 5 out of 6 SmarACT rotational stages are now operations. Some problems remain and AE is talking to the manufacturer
  • FXE
    • Request for use of the beam after 9 PM
    • Can be given to SPB starting at 5 AM tomorrow for final setup 

Detectors

  • Connection to the ONDA system was set up for the detectors
  • Significant latency develops quickly an saturates at approximately 2 mins

ITDM

  • Simultaneous use of the DAQ system by both instruments should be done carefullly

AE

  • no further comment

CAS

  • no further comment