Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 419     Entry time: 13 Nov 2017, 09:45
Author: Adriano Violante 
Location: General 
Severity: Information 
Subject: Status after 9.30 dispatch meeting 

General

  • No user operation.
  • During the week end the accelerator was not able to deliver reliable and stable beam for the user operation.
  • The M2 mirror bender stopped working on Saturday morning and had to be replaced. The mirror and blender were replaced as a whole durig the week end. Normally it would have taker weeks but a "spare" system was already set up for SASE2 and could be used on a short notice. Pumping of the M2 section is ongoing and leak test be performed today.
  • The non working M2 does not show apparent problems so far, and the reason why was not working is not clear.
  • Some sections of the LINAC were warmed up due to some maintenance required for the cold compressors.
  • LINAC is being cooled down and ready for operation today afternoon.
  • The technical support groups were not informed about the problems until saturday afternoon. The communication channels in these cases have to be improved.

Instruments

  • SPB and FXE:
    • The goal is to be able to strat the secondo users run on Thursday (Day FXE, Night SPB).

Tunnels

  • XTD2,9 Ready to take beam in the afternoon (if no leak in M2 is discovered).

ITDM

  • A small bug was found in the DAQ that affects only slow devices  with certain train ids
  • It is proposed to fix this during the next break. Decide on Wednesday

 