Author: |
Adriano Violante |
Location: |
General |
Severity: |
Information |
Subject: |
Status after 9.30 dispatch meeting |
|
|
General
- No user operation.
- During the week end the accelerator was not able to deliver reliable and stable beam for the user operation.
- The M2 mirror bender stopped working on Saturday morning and had to be replaced. The mirror and blender were replaced as a whole durig the week end. Normally it would have taker weeks but a "spare" system was already set up for SASE2 and could be used on a short notice. Pumping of the M2 section is ongoing and leak test be performed today.
- The non working M2 does not show apparent problems so far, and the reason why was not working is not clear.
- Some sections of the LINAC were warmed up due to some maintenance required for the cold compressors.
- LINAC is being cooled down and ready for operation today afternoon.
- The technical support groups were not informed about the problems until saturday afternoon. The communication channels in these cases have to be improved.
Instruments
- SPB and FXE:
- The goal is to be able to strat the secondo users run on Thursday (Day FXE, Night SPB).
Tunnels
- XTD2,9 Ready to take beam in the afternoon (if no leak in M2 is discovered).
ITDM
- A small bug was found in the DAQ that affects only slow devices with certain train ids
- It is proposed to fix this during the next break. Decide on Wednesday
|