SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 241
Entry time: 17 May 2017, 11:55
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status and Plans after 09:30 meeting |
|
|
Interlock in XTD10 is broken today and tunnel is open until 15:00
General:
- Unfortunately, info on access to XTD10 came too late for Vacuum group to organise the work in XTD10
- Technical issues and coordination between AE/CAS and PCT/Instruments continues to happen via SASE1 Readiness Log
Vacuum:
- Issue of spurious beam aborts due to short term vacuum spikes in XGM is solved (respective gauges taken out of interlock?)
- Change to interlock logic was requested by H. Sinn: V0 always closes if one gate valve closes) The reason is that after V0 is closed the accelerator has beam permission and can continue
- This logic will now be implemented in the next update by AE
Imagers:
- Problems with several photonics cameras for data collection exist. The data transfer is sensitive to packet losses. Hence dedicated servers need to be set up to avoid loss of data.
- ITDM has provided one additional server in balcony room. Eventually a dedicated server should be set up in the tunnel
- Maybe the way the camera sends the data could also be optimised
- Auto-scaling switch problem has not been tackled yet and is considered second priority after solving general readout problem
PLC:
- Fix for MC2 lib for TECHNOSOFT motors is ready. Tests together with N. Gerassimova can start today after motion loop update
- SPB can perform a parallel test on the PSLITs
- Motion loop and vacuum loop updates are scheduled for 12:00.
KARABO:
- A bug was found where device clients drop messages and hence the GUI looses the state of the device
- There is a fix that needs to be deployed. This should happen in parallel to the cycling of the loops between 12:00 and 14:00
Next Steps:
- Cycling of vacuum and motion loop at 12:00. T. Freyermuth informs the Photon Commissioning team
- Update of Karabo betweem 12:00 and 14:00
- Tests of PBLM with updated MC2 lib today
- Tests of PSLITS with updated MC2 lib by SPB
|