Group Selection Page
HELP
DOC
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
XRO
EEE
WP78
WP74
FXE
SCS
SPB
MID
HED
SQS
SXP
Sample Environment
Photon Commissioning Team
Operation
PSPO
XO
TS
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 229
Entry time: 12 May 2017, 13:33
|
Author: |
Tobias Haas |
Location: |
General |
Severity: |
Information |
Subject: |
Status and plans after SASE1 Readiness Meeting |
|
|
Focus of meeting is on SASE1 Instruments, Laser and Detectors
SPB (B. Weinhausen)
- All motors in the SPB tunnel loop have been commissioned except for one TECHNOSOFT motor where the updated driver was not yet available
- Comment by P. Gessler:
- The updated MC2 lib was deployed yesterday evening. Testing should be possible now
- The second camera of the screen broke. Concern exists over possible overvoltage in the power that comes directly from the PLC
- All encoders are working
- The vacuum in the Optics hutch is closed
- Info by A. Violante:
- All cabling in D02/D03 is done
- There are a few damaged connectors that prevent pushing in the modules. This should be fixed on Monday
- Pins are swapped in one connector. Will be fixed locally
- Comment by P. Gessler:
- This week AE was busy with AGIPD and tunnels
- Next week resources should be available to support start of commissioning loop 1
FXE (A. Galler)
- E2E tests are progressing
- A recent update of the Beckhoff firmware generated new problems with encoders
- Info from T. Korsch:
- The vacuum in the hutch is closed and has reached 5e-7 mb
- There is a minor leak in one of the bellows
- Compressed air is working to operate the gate valves
- Vacuum gauges can be read out remotely
- Attention should be paid to being able to read out detectors, e. g. diodes
Laser (D. Kane/M. Lederer)
- Slides were provided in INDICO with a detailed account of the status. Only Key points are summarised here:
- Hutch infrastructure is working in general and temperature stability is ok but laser group is lacking access to controlling the parameters, humidity is oscillating and smoke detectors are not connected
- Pre-assembly of PP laser is 75% done
- Beam delivery to instruments is on the list now
- Synchronisation with optical system might not be available before October
- Control are generally working and software has improved a lot but some stages cannot be controlled and Karabo appears still to have some resource leaks
Detectors (M. Kuster)
- LPD is in E2E tests and AGIPD is still being integrated into the XFEL environment
- This week it was possible to run the DAQ chain on LPD for the first time
- All tests on LPD including data taking in the X-Ray chamber in HERA-S should be done by end June
- Situation with AGIPD is more difficult as basic integration is still not complete
Discussion
- Follow up on progress with instruments, laser and detectors will continue in S1R meeting from now on
- The S1R dispatch meeting takes place on Mondays 09:00 in BKR and on Wednesday 09:30 in XHQ
- Groups that require help from AE and CAS and that need to coordinate with other activities should attend
|
|