Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 59     Entry time: 01 May 2025, 07:25
Author: Romain Letrun 
Group: SPB 
Subject: Issue 

SPB pop-in monitor was not dricing to the switch when we retracted it to the "out " position with the MDL this morning. This prevented us to use more than two pulses. We have moved the motor one step of 300 um up, which activated the switch and relased the interlock. This should however be fixed so that the "out" position in the MDL works as expected and the motor operates reliably.

Attachment 1: Screenshot_from_2025-05-01_07-21-57.png  1.199 MB  Uploaded 01 May 2025, 08:26  | Show | Show all
ELOG V3.1.4-7c3fd00