Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 41     Entry time: 06 Apr 2025, 06:33
Author: Harald Sinn 
Group: PRC 
Subject: SA2 status 

5:49 HED called and they have problems with the Laser Sync signal. A change of laser delay is not possibe. We supsect that it is similar to earlier this week at FXE, where a crash of a sync CPU caused a similar error. BRK is informed and tries to reach somebody from sync Group via email (at 6:35, no OCD phone number available) . If this does not work, we will work with the shifts starting at 7:00 on this (DOC and new BKR crew). 

8:45 (see also DESY elog entries): After several attempts LBsync timing works, at least for now. One problem was that the crate was constantly rebooting by itself. Now it is stable, but error could happen again. In that case, BKR should activate expert via email. 

Attachements: Location of LBsync server status in DOOCS and status of XFELcpuSYNCEXP1-3 for last light

Attachment 1: LBsync1.jpg  349 kB  Uploaded 06 Apr 2025, 10:36  | Hide | Hide all | Show all
LBsync1.jpg
Attachment 2: LBsync2.jpg  297 kB  Uploaded 06 Apr 2025, 10:37  | Hide | Hide all | Show all
LBsync2.jpg
Attachment 3: LBsync3.jpg  240 kB  Uploaded 06 Apr 2025, 10:37  | Show | Hide all | Show all
Attachment 4: LBsync4.jpg  251 kB  Uploaded 06 Apr 2025, 10:37  | Hide | Hide all | Show all
LBsync4.jpg
Attachment 5: LBsync5.jpg  275 kB  Uploaded 06 Apr 2025, 10:37  | Hide | Hide all | Show all
LBsync5.jpg
ELOG V3.1.4-7c3fd00