1) BKR calls SUN11h20 and informs about issues with the SA1 SRA. Motors in ERROR.
2) Additionally, there was this morning a fire alarm, where in one rack (SASE1 rack 1.1 in XTD2) the gas extinguishing system was triggered, see also https://ttfinfo.desy.de/XFELelog/show.jsp?dir=/2025/03/19.01_M&pos=2025-01-19T10:22:14
PRC investigating.
BEAM STATUS: SA1 is still lasing at 1100 uJ at 9 keV, IMGFEL is inserted and beam visible. XGM and imagers operational.
- All SA1-SRA MOTORS (SA1_XTD2_PSLIT/MOTOR/) in sa1_beckhoff_mov are in ERROR and cannot be reset.
- Same for SA1_XTD2_FLT/MOTOR/TARGET (in ERROR and cannot be reset)
- SA1_XTD2_SRA_SLIT/MDL/MAIN in ERROR
- Same for SA1_XTD9_IMGPII45/MOTOR/NAVITAR_FOCUS and _ZOOM, but these karabo devices can be RESET, however Hardware State remains ERROR. Hardware interlocked.
- Same for SA1_XTD2_PES/SWITCH/G1_OK and G2_OK, but these karabo devices can be RESET, and the Hardware State here is then OFF. Hardware REGION is normal.
- SA1_XTD2_PES/SERIAL/V101256D and SA1_XTD2_PES/VALVE/V101256D in ERROR, can be reset. the STATE = NORMAL.
- Also found in ERROR: SA1_XTD2_WATCHDOG/MDL/STOP2_BKG_IMGFEL (but can be reset, is stopped).
- BeckhoffPlcMonitor SA1_BR_SYS/PLC/MOV_PLCMON in ERROR, can be reset, Hardware state NORMAL.
- SA1_XTD9_MIRR/ACTRL/RZ in ERROR (not the other related motors)
- SA1_XTD2_PSLIT/LVDT/BLADE... all in ERROR, can be reset, then hardware state ON. Hardware error description: "PLC Error: Terminal is not operational"
- SA1_XTD9_MIRR/ASESN/RY and RZ in ERROR, can be reset, then hardware state ON. Hardware error description: "0xc009"
- SA1_BR_SYS/PLC/XFELO_PLCMON in ERROR, can be reset, Hardware state NORMAL.
- SA1_XTD2_DOOCS/CAM/OTRC_2615_T9 (DOOCS-to-karabo bridge for transmissive imager) not instantiated. I instantiate it, there are no issues, works fine.
- Everything OK with SA1 vacuum devices.
Actions for BKR to continue SASE tuning:
- The IMGFEL image is oversaturated. Changing to BN. The beam is at (13.5mm / 4mm), while the handover cross is at (12.75, 5.22mm). Beam is clipping at the top SRA blade.
- inserting transmissive imager (YAG). Beam is fully visible and centered at X=1045,Y=1140. Instruction to BKR to use this imager to shift the beam center, and then continue on IMGFEL.
Further actions:
- Information to DRC (Bruno)
- He will inform EEE-OCD to look into the issue and see what they might be able to fix without an access.
- If they find out an access is required to fix hardware in XTD2, we will request an access (probably not today but MON or TUE).
- A redmine ticket of DOC will collect the infos from DRC and EEE-OCD.
A similar issue at SA1 XTD2 rack 1.1 had occurred in November 2024, see https://in.xfel.eu/elog/OPERATION-2024/205
Updates MON morning:
- EEE made the access request and it was scheduled for MON 10am: #215916 - Suspected blown fuse replacement in Rack 1.1
|