Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 78     Entry time: 10 Apr 2024, 16:35
Author: Antje Trapp 
Group: XRO 
Subject: start of shift - status 

Starting shift with mirror motor calibration:

- found solid attenuator 0.5mm silicon inserted

- beam is centered on FEL imager

- pblm in XTD9 is inserted

We removed both silicon solid attenuator and pblm

Attachment 1: Init_2024-04-10_16-34-30.png  2.788 MB  Uploaded 10 Apr 2024, 17:53  | Hide | Hide all | Show all
Init_2024-04-10_16-34-30.png
Attachment 2: status_2024-04-10_16-46-01.png  235 kB  Uploaded 10 Apr 2024, 17:53  | Show | Hide all | Show all
Attachment 3: FEL_imag_2024-04-10_16-40-29.png  365 kB  Uploaded 10 Apr 2024, 17:53  | Hide | Hide all | Show all
FEL_imag_2024-04-10_16-40-29.png
Attachment 4: pblm_2024-04-10_16-52-34.png  152 kB  Uploaded 10 Apr 2024, 17:54  | Show | Hide all | Show all
ELOG V3.1.4-7c3fd00