Entry   Shift summary, posted by Tokushi Sato on 30 Mar 2023, 06:53 

X-ray delivery

  • 1-202 pulses, 564, 282, 141 kHz, stable delivery

Optical laser delivery

  • 800nm, 50 fs, 282 kHz, stable delivery

Achievements/Observations

  • Alignment for Pump-probe experiment was finished
  • Sample was tested

Issues

  • No major issue today
Entry   Shift summary, posted by Tokushi Sato on 31 Mar 2023, 06:59 

X-ray delivery

  • 1-202 pulses, 564, 282, 141 , 70.5 kHz, stable delivery

Optical laser delivery

  • 800nm, 50 fs, 282 kHz, stable delivery 

Achievements/Observations

  • Resasnable amout of data was collected
  • Sample was tested

Issues

  • No major issue today
Entry   Shift summary, posted by Tokushi Sato on 01 Apr 2023, 06:51 

X-ray delivery

  • 1-202 pulses, 564 kHz, stable delivery
  • Beam was down from 06:08

Optical laser delivery

  • 800nm, 50 fs, 282 kHz, stable delivery 

Achievements/Observations

  • Resasnable amout of data was collected

Issues

  • No major issue today
Entry   Shift summary, posted by Tokushi Sato on 04 May 2023, 06:41 

X-ray delivery

  • 12.4 keV 200 pulses / train, relatively stable intensity ~0.8 mJ / pulse
  • took some time in changing X-ray energy (from 19.16 keV to 12.4 keV)

Optical laser delivery

  • 420 nm PP laser
  • ns laser for jet imaging

Achievements/Observations

  • M1 & M2 offset mirror optimized
  • NKB focus roughly optimized (we used defocused X-ray beam, about 2um)
  • Collected several runs for inside nozzle pump excitation project (both adaptive gain and fixed MG modes)
  • Nozzle damage with PP laser tested (before and after the night shift)

Issues

  • AGIPD FPGA (2nd hemisphere) issue (requied a power cycle)
Entry   Issue, posted by Tokushi Sato on 05 May 2023, 00:50 Screenshot_from_2023-05-05_00-31-48_1.png

Laser synchronization is gone, unlocked from 04.05.2023, 22.47. E-mail was sent to lbsync-expert@desy.de and c.c. to las-op@xfel.eu.

Entry   Shift summary, posted by Tokushi Sato on 05 May 2023, 06:44 

X-ray delivery

  • 12.4 keV 200 pulses / train, relatively stable intensity ~0.8 mJ / pulse

Optical laser delivery

  • 420 nm PP laser
  • ns laser for jet imaging

Achievements/Observations

  • M1 & M2 offset mirror optimized again (not really optimum but acceptable)
  • NKB focus checked and defocused to have about 2um beam
  • Collected a few dark runs and about 30 runs with PP laser in adaptive gain mode

Issues

  • AGIPD Fixed MG mode issue
  • PP-laser sync issue, but it was solved quickly, thanks to Lbsync team
  • Beam pointing in the FEL Imager was quite off in the beginning of the shift 
  • Hit rate too low (~0.3%)
Entry   Shift summary, posted by Tokushi Sato on 06 May 2023, 06:55 

X-ray delivery

  • 12.4 keV 200 pulses / train, relatively stable intensity ~1.2 mJ / pulse

Optical laser delivery

  • 420 nm PP laser
  • ns laser for jet imaging

Achievements/Observations

  • NKB focus checked and defocused to have about 3um(H) x 6um(V) beam
  • Collected a few hours data with PP laser on both jet and nozzle excitations (AGIPD in adaptive gain mode)

Issues

  • IRU Chamber LED was ON until 2:51am 
  • Nozzle damage found after ~1 hour measurement 
  • Hit rate seems too low still (less than 1%)
  • Nozzle exploded close to the end of the shift 
Entry   Shift summary, posted by Tokushi Sato on 18 May 2023, 18:41 

X-ray delivery

  • 9.3 keV, ~1 mJ, 1-30 pulses, stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • Direct beam trajectory alignment
  • Alignemnt of IRD and microscopy screens
  • rough alignment of XPD WFS

Issues

  • beam down for sometime
  • AGIPD slow data configuration issue, solved by DRC+Cal OCD
Entry   Shift summary, posted by Tokushi Sato on 19 May 2023, 18:39 

X-ray delivery

  • 9.3 keV, 800 uJ, 1-200 pulses, stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • CRL chamber alignment
  • CRL lens stack alignment
  • XPD WFS alignment with CRL focused beam

Issues

  • Some of the CRL lens stacks needs realignment
Entry   Shift summary, posted by Tokushi Sato on 21 May 2023, 18:38 

X-ray delivery

  • 9.3 keV, 800 uJ, 1-200 pulses, stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • HWFS direct beam measured
  • CRL focus measured with YAG screen and camera
  • Setup for CRL heating measurement installed

Issues

  • Difficulties with operation and syncrhonization of FLIR IR camera
Entry   Shift summary, posted by Tokushi Sato on 25 May 2023, 06:35 

X-ray delivery

  • 10.7 keV, 1.2 mJ, 1-200 pulses, stable delivery

Optical laser delivery

  • None

Achievements/Observations

  • Crystal alignment for X-ray microscopy except one crystal
  • Sample camera and Cu mesh were aligned to X-ray position

Issues

  • We found strange strip on the beam in XTD0 screen
Entry   Shift summary, posted by Tokushi Sato on 22 Aug 2023, 23:32 

X-ray delivery

  • 9.3 keV, up to 178 pulses at 564 kHz, 3.7  mJ, stable delivery
  • Beam delivery was started from 19:00

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz

Achievements/Observations

  • Alignment was completed within 3 hours including T0
  • Some data collection with fixed target

Issues

  • XTD9 safety shutter was closed
Entry   Shift summary, posted by Tokushi Sato on 23 Aug 2023, 22:56 

X-ray delivery

  • 9.3 keV, up to 185 pulses at 564 kHz, 3.7  mJ, beam intensity drop, missing last 10-20 pulses in train sometime

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz

Achievements/Observations

  • Alinment for TR-SFX and PAM
  • Data collection for IHR

Issues

  • Beam intensity was not that stable
  • Strange scattering from amorphous sample and powder diffraction were appeared during data collection
Entry   Shift summary, posted by Tokushi Sato on 24 Aug 2023, 22:51 

X-ray delivery

  • 9.3 keV, up to 185 pulses at 564 kHz, 3.7  mJ, stable delivery

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz

Achievements/Observations

  • Alinment for TR-SFX
  • Data collection in dark state and excited state at 203.5 ns

Issues

  • MDL devices and macros on macrosever2 were dead around 19:30, took more than 2 hours for recovery. 
  • Dark calibration issue
Entry   Shift summary, posted by Tokushi Sato on 25 Aug 2023, 23:03 

X-ray delivery

  • 9.3 keV, up to 185 pulses at 564 kHz, 2.7  mJ, stable delivery

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz

Achievements/Observations

  • Alinment for TR-SFX and data collection

Issues

  • AGIPD vacuum gauge was in error, unplug and plug in fixed this error
Entry   Shift summary, posted by Tokushi Sato on 27 Aug 2023, 23:09 

X-ray delivery

  • 9.3 keV, up to 185 pulses at 564 kHz, 2.4  mJ, stable delivery

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz

Achievements/Observations

  • Alinment for TR-SFX and data collection

Issues

  • Nozzles were clogged a lot, crystals were formed on catcher cone.
Entry   Shift summary, posted by Tokushi Sato on 28 Aug 2023, 23:03 

X-ray delivery

  • 9.3 keV, up to 185 pulses at 564 kHz, 2.3  mJ, stable delivery

Optical laser delivery

  • PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz

Achievements/Observations

  • Alinment for TR-SFX and data collection

Issues

  • Karabo did not work sometime, lost more than 1 hours
Entry   Shift summary, posted by Tokushi Sato on 13 Sep 2023, 02:18 

X-ray delivery

  • 0.5 mj, improved to 1.1 mj xray energy in the evening

Optical laser delivery

  • 50 fs, 860 nm as fundamental wavelength, 188 kHz
  • ns for illumination,

Achievements/Observations

  • Aligned the instrument to 9.3 keV
  • Aligned the PPL laser
  • Time zero PPL
  • Measured sample, dark runs, including testing different sample conditions (filtered vs not filtered or lower cutoff)
  • Measured TR-SFX

Issues

  • Low xray energy, BKR improved it afternoon, from 0.5 to 1.1 mj, hopefully we could still get better the following days
  • PP-laser AMPHOS issues
  • The focus at IRU in the evening had issues, we had to redo the alignment partially. We also had to ask BKR to improve the beam alignment at FEL imager.
Entry   Shift summary, posted by Tokushi Sato on 14 Sep 2023, 00:05 

X-ray delivery

  • 1.1 mj, 564 kHz, 93 pulses, stable delivery

Optical laser delivery

  • 50 fs, 860 nm as fundamental wavelength, 188 kHz
  • ns for illumination,

Achievements/Observations

  • Lots of data collection for TR-SFX
  • Tried many samples and optimazation

Issues

  • Beam fluctuation aorund 23 : 00
  • Low hit rate. tried to improve, better than before.
Entry   Shift summary, posted by Tokushi Sato on 14 Sep 2023, 23:03 

X-ray delivery

  • 1.1 mj, 564 kHz, 93 pulses, stable delivery

Optical laser delivery

  • 50 fs, 860 nm as fundamental wavelength, 188 kHz
  • ns for illumination,

Achievements/Observations

  • Lots of data collection for TR-SFX

Issues

  • Sample was accumulated on catcher and strong diffraction was observed, need to vent chamber and clean it, but it happned end of beamtime, we decided to finish experiment 