| ID | 
Date | 
Author  | 
Group | 
Subject | 
 
| 
  115  
 | 
30 Mar 2023, 06:53 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 1-202 pulses, 564, 282, 141 kHz, stable delivery
 
 
Optical laser delivery 
	- 800nm, 50 fs, 282 kHz, stable delivery
 
 
Achievements/Observations 
	- Alignment for Pump-probe experiment was finished
 
	- Sample was tested
 
 
Issues 
 |  
| 
  118  
 | 
31 Mar 2023, 06:59 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 1-202 pulses, 564, 282, 141 , 70.5 kHz, stable delivery
 
 
Optical laser delivery 
	- 800nm, 50 fs, 282 kHz, stable delivery 
 
 
Achievements/Observations 
	- Resasnable amout of data was collected
 
	- Sample was tested
 
 
Issues 
 |  
| 
  119  
 | 
01 Apr 2023, 06:51 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 1-202 pulses, 564 kHz, stable delivery
 
	- Beam was down from 06:08
 
 
Optical laser delivery 
	- 800nm, 50 fs, 282 kHz, stable delivery 
 
 
Achievements/Observations 
	- Resasnable amout of data was collected
 
 
Issues 
 |  
| 
  173  
 | 
04 May 2023, 06:41 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 12.4 keV 200 pulses / train, relatively stable intensity ~0.8 mJ / pulse
 
	- took some time in changing X-ray energy (from 19.16 keV to 12.4 keV)
 
 
Optical laser delivery 
	- 420 nm PP laser
 
	- ns laser for jet imaging
 
 
Achievements/Observations 
	- M1 & M2 offset mirror optimized
 
	- NKB focus roughly optimized (we used defocused X-ray beam, about 2um)
 
	- Collected several runs for inside nozzle pump excitation project (both adaptive gain and fixed MG modes)
 
	- Nozzle damage with PP laser tested (before and after the night shift)
 
 
Issues 
	- AGIPD FPGA (2nd hemisphere) issue (requied a power cycle)
 
  |  
| 
  176  
 | 
05 May 2023, 00:50 | 
Tokushi Sato | SPB | Issue |  Laser synchronization is gone, unlocked from 04.05.2023, 22.47. E-mail was sent to lbsync-expert@desy.de and c.c. to las-op@xfel.eu.  |  
| 
  178  
 | 
05 May 2023, 06:44 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 12.4 keV 200 pulses / train, relatively stable intensity ~0.8 mJ / pulse
 
 
Optical laser delivery 
	- 420 nm PP laser
 
	- ns laser for jet imaging
 
 
Achievements/Observations 
	- M1 & M2 offset mirror optimized again (not really optimum but acceptable)
 
	- NKB focus checked and defocused to have about 2um beam
 
	- Collected a few dark runs and about 30 runs with PP laser in adaptive gain mode
 
 
Issues 
	- AGIPD Fixed MG mode issue
 
	- PP-laser sync issue, but it was solved quickly, thanks to Lbsync team
 
	- Beam pointing in the FEL Imager was quite off in the beginning of the shift 
 
	- Hit rate too low (~0.3%)
 
  |  
| 
  185  
 | 
06 May 2023, 06:55 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 12.4 keV 200 pulses / train, relatively stable intensity ~1.2 mJ / pulse
 
 
Optical laser delivery 
	- 420 nm PP laser
 
	- ns laser for jet imaging
 
 
Achievements/Observations 
	- NKB focus checked and defocused to have about 3um(H) x 6um(V) beam
 
	- Collected a few hours data with PP laser on both jet and nozzle excitations (AGIPD in adaptive gain mode)
 
 
Issues 
	- IRU Chamber LED was ON until 2:51am 
 
	- Nozzle damage found after ~1 hour measurement 
 
	- Hit rate seems too low still (less than 1%)
 
	- Nozzle exploded close to the end of the shift 
 
  |  
| 
  206  
 | 
18 May 2023, 18:41 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, ~1 mJ, 1-30 pulses, stable delivery
 
 
Optical laser delivery 
Achievements/Observations 
	- Direct beam trajectory alignment
 
	- Alignemnt of IRD and microscopy screens
 
	- rough alignment of XPD WFS
 
 
Issues 
	- beam down for sometime
 
	- AGIPD slow data configuration issue, solved by DRC+Cal OCD
 
  |  
| 
  207  
 | 
19 May 2023, 18:39 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, 800 uJ, 1-200 pulses, stable delivery
 
 
Optical laser delivery 
Achievements/Observations 
	- CRL chamber alignment
 
	- CRL lens stack alignment
 
	- XPD WFS alignment with CRL focused beam
 
 
Issues 
	- Some of the CRL lens stacks needs realignment
 
  |  
| 
  208  
 | 
21 May 2023, 18:38 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, 800 uJ, 1-200 pulses, stable delivery
 
 
Optical laser delivery 
Achievements/Observations 
	- HWFS direct beam measured
 
	- CRL focus measured with YAG screen and camera
 
	- Setup for CRL heating measurement installed
 
 
Issues 
	- Difficulties with operation and syncrhonization of FLIR IR camera
 
  |  
| 
  210  
 | 
25 May 2023, 06:35 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 10.7 keV, 1.2 mJ, 1-200 pulses, stable delivery
 
 
Optical laser delivery 
Achievements/Observations 
	- Crystal alignment for X-ray microscopy except one crystal
 
	- Sample camera and Cu mesh were aligned to X-ray position
 
 
Issues 
	- We found strange strip on the beam in XTD0 screen
 
  |  
| 
  318  
 | 
22 Aug 2023, 23:32 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, up to 178 pulses at 564 kHz, 3.7  mJ, stable delivery
 
	- Beam delivery was started from 19:00
 
 
Optical laser delivery 
	- PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz
 
 
Achievements/Observations 
	- Alignment was completed within 3 hours including T0
 
	- Some data collection with fixed target
 
 
Issues 
	- XTD9 safety shutter was closed
 
  |  
| 
  319  
 | 
23 Aug 2023, 22:56 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, up to 185 pulses at 564 kHz, 3.7  mJ, beam intensity drop, missing last 10-20 pulses in train sometime
 
 
Optical laser delivery 
	- PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz
 
 
Achievements/Observations 
	- Alinment for TR-SFX and PAM
 
	- Data collection for IHR
 
 
Issues 
	- Beam intensity was not that stable
 
	- Strange scattering from amorphous sample and powder diffraction were appeared during data collection
 
  |  
| 
  320  
 | 
24 Aug 2023, 22:51 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, up to 185 pulses at 564 kHz, 3.7  mJ, stable delivery
 
 
Optical laser delivery 
	- PP Laser, 800nm, 50 fs, up to 90 pulses @ 282 kHz
 
 
Achievements/Observations 
	- Alinment for TR-SFX
 
	- Data collection in dark state and excited state at 203.5 ns
 
 
Issues 
	- MDL devices and macros on macrosever2 were dead around 19:30, took more than 2 hours for recovery. 
 
	- Dark calibration issue
 
  |  
| 
  323  
 | 
25 Aug 2023, 23:03 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, up to 185 pulses at 564 kHz, 2.7  mJ, stable delivery
 
 
Optical laser delivery 
	- PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz
 
 
Achievements/Observations 
	- Alinment for TR-SFX and data collection
 
 
Issues 
	- AGIPD vacuum gauge was in error, unplug and plug in fixed this error
 
  |  
| 
  327  
 | 
27 Aug 2023, 23:09 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, up to 185 pulses at 564 kHz, 2.4  mJ, stable delivery
 
 
Optical laser delivery 
	- PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz
 
 
Achievements/Observations 
	- Alinment for TR-SFX and data collection
 
 
Issues 
	- Nozzles were clogged a lot, crystals were formed on catcher cone.
 
  |  
| 
  329  
 | 
28 Aug 2023, 23:03 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 9.3 keV, up to 185 pulses at 564 kHz, 2.3  mJ, stable delivery
 
 
Optical laser delivery 
	- PP Laser, 800nm, 50 fs, up to 62 pulses @ 188 kHz
 
 
Achievements/Observations 
	- Alinment for TR-SFX and data collection
 
 
Issues 
	- Karabo did not work sometime, lost more than 1 hours
 
  |  
| 
  341  
 | 
13 Sep 2023, 02:18 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 0.5 mj, improved to 1.1 mj xray energy in the evening
 
 
Optical laser delivery 
	- 50 fs, 860 nm as fundamental wavelength, 188 kHz
 
	- ns for illumination,
 
 
Achievements/Observations 
	- Aligned the instrument to 9.3 keV
 
	- Aligned the PPL laser
 
	- Time zero PPL
 
	- Measured sample, dark runs, including testing different sample conditions (filtered vs not filtered or lower cutoff)
 
	- Measured TR-SFX
 
 
Issues 
	- Low xray energy, BKR improved it afternoon, from 0.5 to 1.1 mj, hopefully we could still get better the following days
 
	- PP-laser AMPHOS issues
 
	- The focus at IRU in the evening had issues, we had to redo the alignment partially. We also had to ask BKR to improve the beam alignment at FEL imager.
 
  |  
| 
  342  
 | 
14 Sep 2023, 00:05 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 1.1 mj, 564 kHz, 93 pulses, stable delivery
 
 
Optical laser delivery 
	- 50 fs, 860 nm as fundamental wavelength, 188 kHz
 
	- ns for illumination,
 
 
Achievements/Observations 
	- Lots of data collection for TR-SFX
 
	- Tried many samples and optimazation
 
 
Issues 
	- Beam fluctuation aorund 23 : 00
 
	- Low hit rate. tried to improve, better than before.
 
  |  
| 
  344  
 | 
14 Sep 2023, 23:03 | 
Tokushi Sato | SPB | Shift summary |  X-ray delivery 
	- 1.1 mj, 564 kHz, 93 pulses, stable delivery
 
 
Optical laser delivery 
	- 50 fs, 860 nm as fundamental wavelength, 188 kHz
 
	- ns for illumination,
 
 
Achievements/Observations 
	- Lots of data collection for TR-SFX
 
 
Issues 
	- Sample was accumulated on catcher and strong diffraction was observed, need to vent chamber and clean it, but it happned end of beamtime, we decided to finish experiment 
 
  |  
 
 |