| ID | Date | Author | Group | Subject | 
| 128 | 08 Apr 2023, 10:29 | Andreas Galler | PRC | Issue | 
| Changed EPS Interlock condition for SPB_XTD9_IMGPI/SWITCH/SCREEN_OUT SPB/SFX called DOC this morning for being limitied to two pulses by the EPS (Instrument should have called PRC instead)After tracing the issue to the SPB_XTD9_IMGPI/SWITCH/SCREEN_OUT switch SPB/SFX decided to take this imager out of the interlock, confirming on camera that no screen was inserted.
 EEE and DOC investigated the issue without conclusion https://redmine.xfel.eu/issues/151238
 
 SPB_XTD9_IMGPI/SWITCH/SCREEN_OUT disabled in EPS Mode30 and Mode400for todays SPB/SFX shift we'll keep it like this, PRC will check with FXE when they take over at 23:00
 | 
| 127 | 07 Apr 2023, 23:57 | Yifeng Jiang | FXE | Issue | 
| After receiving beam from SPB, we noticed that there is a werid shape of beam in the FEL imager which was not observed yesterday. Maybe someone left X-ray component in the beam. | 
| Attachment 1: 2023-04-07-235513_774809068_exflqr51474.png | 
|   | 
| 126 | 07 Apr 2023, 23:03 | Johan Bielecki | SPB | Shift summary | 
| Beam delivery for proposal 3378 Achievements/Observations 
	Collected data on liquid H20 and D20Found conditions where only ice were seen. approx. 4h of ice data taken. Starting to look at correlation mapsBackground at 0.88mm nozzle distance measured To do for next shift: Continue taking data     | 
| 125 | 07 Apr 2023, 23:00 | Alejandro Laso Garcia | HED | HED Shift Summary 07.04. | 
| Morning - Users from proposal 3455 continued with their measurement program. Beam stable during the measurements. Afternoon - Changed the setup from 3455 to 3326. Evening - Beginning of the alignment for users. Beam stable. | 
| 124 | 04 Apr 2023, 11:18 | Johan Bielecki |  | XTD2 Si500 attenuator broken | 
| Attachment 1: Beam in SPB hutch with Si500 Attachment 2: Beam without Si500 | 
| Attachment 1: Screenshot_from_2023-04-04_11-17-46.png | 
|   | 
| Attachment 2: Screenshot_from_2023-04-04_11-18-04.png | 
|   | 
| 123 | 04 Apr 2023, 08:37 | Frederik Wolff-Fabris | PRC | Issue | 
| TUE 08:30AM: The SA3 Cell 17 & 18 Phase shifters do not move and encoders are damaged. A ZZ is needed to exchange the encoders. Instruments are informed and access will take place Tuesday morning. Machine has separated the north branch. *** Update 10:20AM: ZZ is finished; beam in North Branch to restart soon.   | 
| 122 | 04 Apr 2023, 07:11 | Lisa Randolph, Carsten Baehtz, Alexander Pelka | HED | Summary day shift 2023-04-04 | 
| 04 Apr 2023, 07:44 we realize that the SetpointsHED Macro lost all values, probably during the Karabo Crash. Since it is a macro, the values arent stored anywhere. DOC tries to recover. Meanwhile, we found the values for 3mrad, 2.5mrad and 2mrad in old screenshots and update the macro values from that. Saving those now locally in nextcloud/user/Alex. 04 Apr 2023, 08:17 Solution by DOC: Apparently the macro CAN save the values, and that was also done during the bringupdays, but they are only saved on the GUI Server which the macro was started on, in this case GUI2. However, when Karabo was restarted, the macro was started on GUI1, so the local save files could not be retrieved. DOC copied the old save files to GUI1 now as well so we could reload the old positions for all setpoints. 
   | 
| Attachment 1: FEL_imager_2023-04-04_08-09-58.png | 
|   | 
| 121 | 03 Apr 2023, 06:38 | Loic, Yi-Ping | SCS | Night shift summary 02.04.2023 | 
| Achievements: Collected more scans on cyanocobalamin, both delays scans and dynamic XAS Issues with bad signal in beginning but good signal in the last hours Overall successful beamtime, demonstrating new transmission/absorption setup with liquid jet and DSSC Problems: None | 
| 120 | 02 Apr 2023, 04:46 | Benjamin van Kuiken | SCS | Late Shift Summary | 
| Achievement 
	Measured tXAS at the Fe L-edge of Fe(bpy)3 using both delay and energy scans.  Issues 
	The cold traps ran empty on the chamber resulting in a pressure spike that interlocked the DSSCThe rough vacuum of the chem DPS degraded causing TP5 to go into error. This resulted in valve closing and stopping the measurementsJet froze twice | 
| 119 | 01 Apr 2023, 06:51 | Tokushi Sato | SPB | Shift summary | 
| X-ray delivery 
	1-202 pulses, 564 kHz, stable deliveryBeam was down from 06:08 Optical laser delivery 
	800nm, 50 fs, 282 kHz, stable delivery  Achievements/Observations 
	Resasnable amout of data was collected Issues | 
| 118 | 31 Mar 2023, 06:59 | Tokushi Sato | SPB | Shift summary | 
| X-ray delivery 
	1-202 pulses, 564, 282, 141 , 70.5 kHz, stable delivery Optical laser delivery 
	800nm, 50 fs, 282 kHz, stable delivery  Achievements/Observations 
	Resasnable amout of data was collectedSample was tested Issues | 
| 117 | 31 Mar 2023, 05:10 | Benjamin, Yi-Ping, Ru-Pan, Andreas | SCS | Late Shift Summary | 
| Achievements 
	Optimized BOZ for Co and FeEstabilished Stable liquid jet flow with 30 mM Fe(bpy)3 Problems 
	Jet froze several timesChamber warmed up earlier in the day. This led to a "dusting" of CNCbl on many surfaces and in the large turbo. We cleaned the turbo with ethanol. Plan for Night Shift 
	Continue measuring stitic XAS with BOZ scheme. | 
| 116 | 31 Mar 2023, 01:51 | Jörg Hallmann | MID | shift summary March 30th | 
| - seeding at ~800 uJ - repaired the laser interlock of A.08 - EPIX back in operation - timing difference of both branches of the SDL measured with the optical laser (~4ps) - measurement of samples with single & both branches (damage threshold, crystallization studies & studies on reversible changes)   | 
| 115 | 30 Mar 2023, 06:53 | Tokushi Sato | SPB | Shift summary | 
| X-ray delivery 
	1-202 pulses, 564, 282, 141 kHz, stable delivery Optical laser delivery 
	800nm, 50 fs, 282 kHz, stable delivery Achievements/Observations 
	Alignment for Pump-probe experiment was finishedSample was tested Issues | 
| 114 | 30 Mar 2023, 04:16 | Benjamin, Robert, Yi-Ping, Ru-Pan | SCS | Shift Summary | 
| Achievements 
	Found coarse timing between XFEL and optical laser Problems 
	Did not see a observe fine timing signal from silicon nitride measurement Plan for night shift 
	Continue with liquid jet optimization and static measurements | 
| 113 | 30 Mar 2023, 02:37 | Jörg Hallmann | MID | shift summary March 29th | 
| achievments: alignment of the SDL (both branches) measuring of samples & calibrants   issues: - broken laser interlock - cannot be set - PRC is informed and contacted SRP - repair expected in the morning - ScannerX broken - morning shift might contact DOC or expert - EPIXs do not send data after rearrangement of the modules - expert consulation might be necessary | 
| 112 | 29 Mar 2023, 01:31 | Jörg Hallmann | MID | Shift summary March 28th | 
| Seeding at 9 keV with 800 - 1000uJ intensity 1. alignment of the lower branch of the SDL 2. focussing with CRL2 and check of the beam size using wire scans (slightly more than 10 um) 3. calibration of the EPIX2 position using calibrant LaB6 and optimizing its position 4. measuring scattering of the sample (not a conclusive behaviour yet) | 
| 111 | 28 Mar 2023, 15:26 | Angel Rodriguez Fernandez | MID | Issue | 
| The door from MID side entrance was smashed and we lost the radiation permit. The acciedent happened between 11 (when the door was lest use by MID members) and 14:19 (when the picture was taken). It is possible that we will have the permit in the next hours to countinue. The Door was repared by TS (thank you for the fast answer) and at 15:40 Eric gave us the right to proceed after the crosscheck of all the systems. | 
| Attachment 1: IMG_8399.JPG | 
|   | 
| 110 | 26 Mar 2023, 23:27 | Jayanath Koliyadu | SPB | Shift end | 
| X-ray delivery 
	1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350  uJ @ 50 pC Optical laser delivery Achievements/Observations 
	Collected data for about 6 hours with different samplesData collection at lower repetiton rates with less number of pulsesData to characterize the divergence of ASE collectedPhotodiode calibrated at 8 keV again | 
| 109 | 26 Mar 2023, 13:26 | Naresh Kujala | PRC | Status | 
| Machine RC Raimond informed PRC that there is an issue with the A4 module that needs to fix to have a continuous operation. To fix this they need 20 min. Agreed with all instruments (SPB, SQS, and HED) that at 13:30hr machine will take over the beam for 20 min. Update: 13:55hr Machine finished fixing the issue for the A4 module and beam handover to all beamlines.     |