Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 14 of 24  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Group Subject Text Attachments
  209   25 May 2023, 01:59 Jörg HallmannMIDShift summaryoptimization of seeding ongoing

tasks achieved during alignment:

- polarizer aligned
  
  208   21 May 2023, 18:38 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 800 uJ, 1-200
pulses, stable delivery


Optical
  
  207   19 May 2023, 18:39 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, 800 uJ, 1-200
pulses, stable delivery


Optical
  
  206   18 May 2023, 18:41 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, ~1 mJ, 1-30 pulses,
stable delivery


Optical
  
  204   14 May 2023, 05:33 Tommaso MazzaSQSIssueSA3 GATT has trouble in setting the pressure
at ~0.5mbar. setting any value between 0.5
and 0.6 will have it settle around 0.48.
 Screenshot_from_2023-05-14_08-19-46.png 
  205   13 May 2023, 22:18 Maurizio VannoniXRO14.8 keV SPB 2mrad AlignmentMirror positions and beam position on the
imagers for 14.8 keV SPB, 2mrad

ATTENTION: the alignment was difficult
 6x 
  203   12 May 2023, 23:21 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.8 mJ, 202 pulses
most of the day.
Attempted tuning
  
  202   12 May 2023, 16:12 Frederik Wolff-FabrisXOSA3 statusThe SA3 EPS power limit at the Big brother
was disabled to allow photon energy scans
in SQS (due to Kr resonance at XGM, invalid
  
  201   11 May 2023, 23:48 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.4-1.8 mJ and
12 keV, 1.1 mJ. 202 pulses most of the day.
Reduced
  
  200   11 May 2023, 09:21 Michaela PetrichPRCAttentionDear all,

I just got the information for
BKR that due to a failed klystron we had
  
  199   11 May 2023, 05:07 Konopkova ZuzanaHEDShift summarybeam parameters: 18 keV, 1 pulse on demand,
400 uJ

achieved:
  
  198   10 May 2023, 23:23 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.6 mJ, 202 pulses
msot of the day.
Slope across
  
  197   10 May 2023, 09:51 karen appelHEDShift summaryfor 9th of May - 10th of May:
user experiment 2740 , first users with DIPOLE100-X
long pulse laser
  
  196   09 May 2023, 23:09 Romain LetrunSPBShift summaryX-ray delivery


9.3 keV, 1.8 mJ, 202 pulses
most fo the day. Pronounced (~30-40%) slope
  
  195   08 May 2023, 09:04 Jan GruenertPRCAttentionInfo from XRO (Maurizio Vannoni) to PRC
concerning tunnel access
request #152936 (Inspection and repair of
  
  194   08 May 2023, 02:38 Jan-Etienne PudellMIDShift summaryStable beam delivery with 23keV and 140µJ
at 2.2, 1.1 and 0.55MHz

 
  
  193   07 May 2023, 23:11 Sergii, PhuongSCSLate shift summary 07.05.2023Achivments:

-Move DSSC closer to the sample.

-Measure delay scans for opposite
  
  192   07 May 2023, 14:47 Giuseppe MercurioSCSmorning shift summaryachievements


exchanged He dewar and
managed to cool down the sample again after
  
  191   07 May 2023, 06:52 Giuseppe MercurioSCSshift summaryachievements:


measured delay scans on
16 nm samples at different magnetic fields
  
  190   07 May 2023, 02:23 Jan-Etienne PudellMIDShift summaryWe had stable x-ray delivery with 120µJ
and up to 300 pulses.

Successful user data acquisition
  
ELOG V3.1.4-7c3fd00