Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 465     Entry time: 24 Jan 2024, 14:00
Author: Antje Trapp 
Group: XRO 
Subject: scanning for HED beam 

We found reflection of M3 on M2 popin, but could not locate the beam on HED PBLM nor HED_XTD6_SDLBM-1

scanning both horizontally and vertically around previously saved positions on M3 popin.

managed to get beam through to sdlbm-1. No beam found downstream of that.

Saved motor positions in last picture

 

ATTENTION: M3 MOTORS STILL NOT CALIBRATED AFTER MECHANICAL INTERVENTION DURING WMP. EULER MDL NOT WORKING RELIABLY FOR M3

Attachment 1: scanning-vertical-horizontal_2024-01-24_13-59-55.png  2.360 MB  | Hide | Hide all | Show all
scanning-vertical-horizontal_2024-01-24_13-59-55.png
Attachment 2: sdlbm_2024-01-24_14-12-12.png  1.252 MB  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2024-01-24_15-28-26.png  425 kB  Uploaded 24 Jan 2024, 15:28  | Hide | Hide all | Show all
Screenshot_from_2024-01-24_15-28-26.png
Attachment 4: mirror-motors__2024-01-24_15-32-14.png  335 kB  Uploaded 24 Jan 2024, 15:34  | Show | Hide all | Show all
ELOG V3.1.4-7c3fd00