Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 453     Entry time: 22 Nov 2023, 10:19
Author: Johannes Moeller 
Group: MID 
Subject: Issue 

The Si 0.5mm absorber of XTD1 attenuator seems to be damaged. First screenshot is with that one inserted. In the second screenshot, it is replaced with a Si 0.5mm from MID_XTD6_ATT.

 

Attachment 1: Screenshot_from_2023-11-22_10-15-34.png  689 kB  | Hide | Hide all
Screenshot_from_2023-11-22_10-15-34.png
Attachment 2: Screenshot_from_2023-11-22_10-14-47.png  476 kB  | Hide | Hide all
Screenshot_from_2023-11-22_10-14-47.png
ELOG V3.1.4-7c3fd00