Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 453     Entry time: 22 Nov 2023, 10:19
Author: Johannes Moeller 
Group: MID 
Subject: Issue 

The Si 0.5mm absorber of XTD1 attenuator seems to be damaged. First screenshot is with that one inserted. In the second screenshot, it is replaced with a Si 0.5mm from MID_XTD6_ATT.

 

Attachment 1: Screenshot_from_2023-11-22_10-15-34.png  689 kB  | Hide | Hide all | Show all
Screenshot_from_2023-11-22_10-15-34.png
Attachment 2: Screenshot_from_2023-11-22_10-14-47.png  476 kB  | Show | Hide all | Show all
ELOG V3.1.4-7c3fd00