Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 413     Entry time: 25 Oct 2023, 02:43
Author: Diogo Filipe Monrroy Vilan e Melo 
Group:  
Subject: SASE 3 background heavily impacts our focus 

Attch 1: We were having trouble focusing at IRU chamber. After multiple attempts the best we could achieve was 2.9-3.1 um beam.

Attch 2: We then wanted to test if this was caused by the SASE 3 background, after them changing from >350 pulses to 1, we saw an instant improvement of ~0.5um down to 2.3 um beamsize.

Attch 3: After optimizing without SASE 3 background, we got down to 1.9 um (1 um less then with SASE 3).

Attch 4: Finally, after SASE 3 changing back to their <350 pulses the beam now changed from 1.9 to 3.9 um! (instead of the previous 3.1um)

 

This because the SASE1+SASE3 focus =/= SASE1 focus....

 

We did not have much time to tune the beam without SASE 3 background, we should think about managing this tomorrow during alignment, and also for data collection...

Attachment 1: Screenshot_from_2023-10-25_02-21-29.png  733 kB  Uploaded 25 Oct 2023, 03:46  | Hide | Hide all | Show all
Screenshot_from_2023-10-25_02-21-29.png
Attachment 2: Screenshot_from_2023-10-25_02-36-16.png  734 kB  Uploaded 25 Oct 2023, 03:47  | Hide | Hide all | Show all
Screenshot_from_2023-10-25_02-36-16.png
Attachment 3: Screenshot_from_2023-10-25_02-37-38.png  736 kB  Uploaded 25 Oct 2023, 03:54  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2023-10-25_02-42-21.png  746 kB  Uploaded 25 Oct 2023, 03:54  | Hide | Hide all | Show all
Screenshot_from_2023-10-25_02-42-21.png
ELOG V3.1.4-7c3fd00