Group:  
Subject: SASE 3 background heavily impacts our focus 

Attch 1: We were having trouble focusing at IRU chamber. After multiple attempts the best we could achieve was 2.9-3.1 um beam.

Attch 2: We then wanted to test if this was caused by the SASE 3 background, after them changing from >350 pulses to 1, we saw an instant improvement of ~0.5um down to 2.3 um beamsize.

Attch 3: After optimizing without SASE 3 background, we got down to 1.9 um (1 um less then with SASE 3).

Attch 4: Finally, after SASE 3 changing back to their <350 pulses the beam now changed from 1.9 to 3.9 um! (instead of the previous 3.1um)

 

This because the SASE1+SASE3 focus =/= SASE1 focus....

 

We did not have much time to tune the beam without SASE 3 background, we should think about managing this tomorrow during alignment, and also for data collection...

Attachment 1: Screenshot_from_2023-10-25_02-21-29.png  733 kB  Uploaded 25 Oct 2023, 03:46  | Hide | Hide all | Show all
Screenshot_from_2023-10-25_02-21-29.png
Attachment 2: Screenshot_from_2023-10-25_02-36-16.png  734 kB  Uploaded 25 Oct 2023, 03:47  | Show | Hide all | Show all
Attachment 3: Screenshot_from_2023-10-25_02-37-38.png  736 kB  Uploaded 25 Oct 2023, 03:54  | Show | Hide all | Show all
Attachment 4: Screenshot_from_2023-10-25_02-42-21.png  746 kB  Uploaded 25 Oct 2023, 03:54  | Hide | Hide all | Show all
Screenshot_from_2023-10-25_02-42-21.png