Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 35     Entry time: 16 Feb 2023, 14:04
Author: Frederik Wolff-Fabris 
Group: XO 
Subject: SA2 status 

Data for the Horizontal jitter at the HED Pop-In was observed during beam delivery on cw05 (03-05.Feb) and cw07 (14-16.Feb) (see attached pictures). 

We have a similar base jitter in both periods of beam delivery to HED, ranging from a minimum of 50-60um to around 80-100um in both operational weeks.

 

Attachment 1: HED_PopinX_cw05_23.png  101 kB  | Show | Show all
Attachment 2: HED_PopinX_cw07_23.png  96 kB  | Show | Show all
ELOG V3.1.4-7c3fd00