Message ID: 322     Entry time: 25 Aug 2023, 07:29
Author: Tommaso Mazza 
Group: SQS 
Subject: Shift summary 

problems with machine operation

very low yield at 1.8keV, took ~2hrs tuning time to get 600uJ (linear taper)

SA3 cells opened without us knowing when hv was changed

observed strong pointing change (and beam profile shape) when changing

- SASE3 pulse timing

- photon energy

pointing change with changing photon energy was such that the beam would make it through the GATT only partially (att. 1). this is unprecedented.

Attachment 1: Screenshot_from_2023-08-25_02-31-19.png  328 kB  Uploaded 25 Aug 2023, 08:34  | Show | Show all