Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 231     Entry time: 08 Jun 2023, 10:37
Author: Jan Gruenert 
Group: PRC 
Subject: Issue 

SASE2 vacuum incident

7h10 : MID informs PRC about a vacuum incident in the SASE2 tunnel which tripped the beam. Instructed to contact directly VAC-OCD

8h26 : VAC-OCD informs that investigation is ongoing, but beam can be delivered. This kind of trip usually occured rarely
           and usually can be reset by VAC. Apparently the source of the issue is at the XTD1 solid attenuators.

8h36 : MID confirms to PRC that already 3 trips occcured but the experiment so far can continue. Beam delivery continues.

10h11 : VAC-OCD informs that now there is a bigger more wide-spread issue with the XTD1 vacuum system
           and beam operation is stopped for at least 1 hour. VAC group and DOC are working on the issue.

11h : It turns out that the vacuum bellows of the 2.4mm diamond attenuator in SA2_XTD1_ATT has a leak, which is worse and
         not acceptable in terms of vaccuum in the extracted state (bellows elongated) but less severe in the inserted state (bellows compressed).

12h33 : info by VAC: issue is temporarily solved by blocking the 2.4mm diamond arm in the IN position. Must clarify today how to proceed further.
          The vacuum issue thus is temporarily solved, beam permission is back,

12h38 : Beam coming back to MID. MID can work today with this ATT always inserted, but not for the weekend.

Attachment 1: 2023-06-08_SA2-beam-delivery.JPG  78 kB  Uploaded 09 Jun 2023, 00:18  | Show | Show all
ELOG V3.1.4-7c3fd00