Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 205     Entry time: 13 May 2023, 22:18
Author: Maurizio Vannoni 
Group: XRO 
Subject: 14.8 keV SPB 2mrad Alignment 

Mirror positions and beam position on the imagers for 14.8 keV SPB, 2mrad

ATTENTION: the alignment was difficult due to the strong background from SA3 with 500 pulses. For the future, maybe SA3 could reduce to single pulse during alignment of SA1. This would make the process easier.

fig1: M2 popin

fig2: M3 popin

fig3: SPB popin

fig4: beam transport overview

fig5: mirrors positions

fig6: for comparison, this is the M2 popin image when a strong background from SASE3 is coming (500 pulses, 3milliJoule, 2.1 keV)

 

 

Attachment 1: Screenshot_2023-05-13_at_22.11.52.png  1.299 MB  Uploaded 13 May 2023, 23:20  | Hide | Hide all | Show all
Screenshot_2023-05-13_at_22.11.52.png
Attachment 2: Screenshot_2023-05-13_at_22.10.57.png  1.498 MB  Uploaded 13 May 2023, 23:20  | Show | Hide all | Show all
Attachment 3: Screenshot_2023-05-13_at_22.09.43.png  2.404 MB  Uploaded 13 May 2023, 23:21  | Hide | Hide all | Show all
Screenshot_2023-05-13_at_22.09.43.png
Attachment 4: Screenshot_2023-05-13_at_22.09.31.png  1.233 MB  Uploaded 13 May 2023, 23:21  | Hide | Hide all | Show all
Screenshot_2023-05-13_at_22.09.31.png
Attachment 5: Screenshot_2023-05-13_at_22.13.30.png  1.847 MB  Uploaded 13 May 2023, 23:22  | Show | Hide all | Show all
Attachment 6: Screenshot_2023-05-13_at_22.14.54.png  1.467 MB  Uploaded 13 May 2023, 23:23  | Hide | Hide all | Show all
Screenshot_2023-05-13_at_22.14.54.png
ELOG V3.1.4-7c3fd00