First four pictures: beam line status at beginning of shift - Beam aligned to MID
Idea is to check M2 parasitic motions again on M3 popin. therefore bringing M2 close to 0 with all vertical motors and Tx as much as possible without using beam on the popin.
Adjusting M1 pitch with it
Approch - drive roll and correct rz offest to stay in at the same horizontal position - adjust also ROLL Offset to show 0 in middle position
When ROLL IS DONE continuE with rx and then ty
offset calibration needs iteration. We started the second iteration but could not finish.
Other pictures: documentation of calibration process |