Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn  Not logged in ELOG logo
Message ID: 101     Entry time: 23 Mar 2023, 14:31
Author: Romain Letrun 
Group: SPB 
Subject: Status 

After SASE1 HIREX GOTTHARD reconfiguration, we now get a single pulse per frame. This was verified by comparing data from HIREX recorded with 564 kHz and 1.13 MHz X-ray repetition rates. Both intensity and number of peaks is comparable for the two repetition rates.

Attachment 1: 20230323_HIREX_integral2.png  118 kB  | Show | Hide all | Show all
Attachment 2: 20230323_HIREX_mean_spectrum2.png  39 kB  | Show | Hide all | Show all
Attachment 3: 20230323_HIREX_peaks2.png  104 kB  | Hide | Hide all | Show all
20230323_HIREX_peaks2.png
ELOG V3.1.4-7c3fd00