ID |
Date |
Author |
Type |
Category |
Subject |
4
|
10 Aug 2023, 10:19 |
Kai-Erik Ballak | Problem Fixed | General | Rack Room |
The door between the rack room and the laboratory could no longer be opened.
The door between the rack room and the lab can be opened again with the DACHS card.
TS had replaced the batteries yesterday. |
3
|
02 Aug 2023, 16:28 |
Kai-Erik Ballak | Firmware-Update | Measurement Equipment | Firmware-Update Fluke 1775 Power Quality Analyzer |
The Fluke 1775 Power Quality Analyzer with S/N: 57267506 and QR: 51398 has received the new firmware version: 2.1.
The old firmware version was: 1.2
The firmware update ran without any problems.
Fluke 177X Firmware V2.1 Release Notes
Date: 18 April 2023
New Features:
Support for BNC Adapters and DC current clamps added.
DC offset compensation of BNC Adapters and DC current clamps implemented. See BNC Adapter
Instructions.
It ‘s recommended that the DC Offset Compensation should be repeated after inverting a
current channel or after correcting the connections of the current probes digitally.
Improvements:
Detection and repair of a misconfiguration of current ADCs (analog to digital convertors).
The correct measurement range is used in all applicable cases.
Known Issues:
If the device is connected to a Wi-Fi infrastructure with Wi-Fi hotspots which use the same SSID, data
communication may be unstable. |
2
|
02 Aug 2023, 16:06 |
Kai-Erik Ballak | Tools | Tool inventory | Donation of transport trolleys to XHWS |
Andre and I drove the two EEE transport trolleys over to XHWS today and handed them over to Olli for storage.
This gives us more space in the electronics lab.
XHWS lends out transport trolleys if they are needed.
Patrick, as group leader, agreed to this. |
5
|
30 Aug 2024, 11:01 |
Kai-Erik Ballak | Routine | Annual safety check | All leaders and ‘elephants’ |
All our leaders and ‘elephants’ have undergone the annual safety check and all have received an inspection sticker. |
Attachment 1: 20240828_143154.jpg
|
|
Attachment 2: 20240828_143202.jpg
|
|
6
|
25 Oct 2024, 13:48 |
Kai-Erik Ballak | Electronics Lab | Annual safety check | Addendum: Regular check of fire extinguishers |
On 30 August 2024, I moved all the fire extinguishers from the laboratory and rack room to the corridor outside so that the TN could check them on 2 September 2024.
All fire extinguishers passed the inspection and were brought back in by me on 02/09/2024.
|
Attachment 1: 20240830_170512.jpg
|
|
Attachment 2: 20240830_170522.jpg
|
|
Attachment 3: 20240830_170538.jpg
|
|
Attachment 4: 20240830_170553.jpg
|
|
Attachment 5: 20240830_170600.jpg
|
|
1
|
02 Aug 2023, 09:49 |
Kai-Erik Ballak | Routine | Hardware | Addendum due to collection of HV power supply FuG HCK 400 - 2000 MOD |
Benoit of the Vacuum Group picked up the FuG HCK 400 - 2000 MOD high voltage power supply with S/N: 23399-01-01 2022/01 and QR: 50697 on Monday, July 31, 2023.
The HV power supply was on loan to PLC-Team (substitute Jan). |