Addendum: Regular check of fire extinguishers, posted by Kai-Erik Ballak on 25 Oct 2024, 13:48
|
On 30 August 2024, I moved all the fire extinguishers from the laboratory and rack room to the corridor outside so that the TN could
check them on 2 September 2024.
|
All leaders and ‘elephants’, posted by Kai-Erik Ballak on 30 Aug 2024, 11:01
|
All our leaders and ‘elephants’ have undergone the annual safety check and all have received an inspection sticker. |
Rack Room, posted by Kai-Erik Ballak on 10 Aug 2023, 10:19
|
The door between the rack room and the laboratory could no longer be opened.
The door between the rack room and the lab can be opened again with the DACHS card.
TS had replaced the batteries yesterday. |
Firmware-Update Fluke 1775 Power Quality Analyzer, posted by Kai-Erik Ballak on 02 Aug 2023, 16:28
|
The Fluke 1775 Power Quality Analyzer with S/N: 57267506 and QR: 51398 has received the new firmware
version: 2.1.
The old firmware version was: 1.2 |
Donation of transport trolleys to XHWS, posted by Kai-Erik Ballak on 02 Aug 2023, 16:06
|
Andre and I drove the two EEE transport trolleys over to XHWS today and handed them over to Olli for storage.
This gives us more space in the electronics lab.
XHWS lends out transport trolleys if they are needed. |
Addendum due to collection of HV power supply FuG HCK 400 - 2000 MOD, posted by Kai-Erik Ballak on 02 Aug 2023, 09:49
|
Benoit of the Vacuum Group picked up the FuG HCK 400 - 2000 MOD high voltage power supply with S/N: 23399-01-01 2022/01 and QR:
50697 on Monday, July 31, 2023.
The HV power supply was on loan to PLC-Team (substitute Jan). |